• Candidate must have experience on Niigata Engines
  • Manages and oversees the daily operations of power plant
  • Responsible for maintenance of power plant engines and generators
  • Ensuring equipment life and safety and operational efficiencies
  • Maintaining efficient plant equipment operation and supervision by establishing operational procedures
  • Managing the daily operations, maintenance and repair of plant equipment
  • Conducting periodic inspections analysis reviews and maintaining related documents
Skills:
  • Candidate must have strong sense of responsibility, flexibility and the ability to work at fast pace.
  • Candidate must be a good communicator in a written and spoken English, have outstanding records of academic and non-academic activities.
  • Have the initiative, drive and creativity to rapidly progress & contribute to the objectives and culture of the company.

Remuneration:

Attractive Salary, accommodation and other attractive benefits will be provided by the company

Job Details

Industry:
Functional Area:
Total Positions:
1 Post
Job Shift:
First Shift (Day)
Job Type:
Job Location:
Gender:
Male
Age:
35 - 45 Years
Minimum Education:
Bachelors
Degree Title:
B.Sc Mechanical Engineering
Career Level:
Department Head
Minimum Experience:
10 Years (Preferably in maintaining Niigata Engines)
Work Permit:
Pakistan
Require Travel:
Not Required
Apply Before:
Jul 19, 2014
Posting Date:
Apr 18, 2014

Ibrahim Fibres Ltd

Chemicals · 3501-4000 employees - Faisalabad

IBRAHIM FIBRES LTD is a manufacturer in Pakistan having diversified business activities including Polyester Staple Fiber production, Polyester Yarn production, Financial Services, Banking and Energy. Ibrahim Fibres Polyester Plant: Polyester plant manufacturing operations are staggered in three production lines located within the same premises, at 38th K.M. Faisalabad – Sheikhupura Road, Faisalabad with a capacity to produce 390,600 tons per annum of Polyester Staple Fibre (PSF) Ibrahim Fibres Textile Plant: Spun Yarn Division of Ibrahim Fibres Limited consists of three projects having total installed capacity of 137,856 spindles. Ibrahim Fibres Power Generation: Power Generation Plants of Ibrahim Fibres Limited consist of two production plants; Power Generation Plant – I and Power Generation Plant – II. Total power generation capacity of these plants is 73.3 MW. Financial Services The consortium of Ibrahim Leasing Limited and Ibrahim Group assumed the control of the Allied bank in August 2004 by injecting Rs 14.2 billion into the capital of Allied bank for acquiring 325 million additional shares.

What is your Competitive Advantage?

Get quick competitive analysis and professional insights about yourself
Talk to our expert team of counsellors to improve your CV!
Try Rozee Premium
I found a job on Rozee!