27 years Civil Construction and Maintenance experience and able to manage followings.
Manage and direct building supervisors, contractors, or design professionals to discuss and resolve matters, such as work procedures, complaints, or construction problems related to Civil engineering including Electrical, plumbing, HVAC and allied fields.
2) Schedule the project in logical steps and budget time required to meet deadlines.
3) Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, suppliers and contractors.
4) Prepare and submit budget estimates, progress reports, or cost tracking reports.
5) Analyze survey reports, maps, drawings, blueprints, and other topographical or geologic data to plan projects.
6) Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the department.
7) Plan, organize, or direct activities concerned with the construction or maintenance of structures, facilities, or systems.
8) Take actions to deal with the results of delays, or emergencies at construction site.
9) Inspect or review projects to monitor compliance with building and safety codes, or other regulations.
10) Study job specifications to determine appropriate construction methods.
11) Select, contract, and oversee workers who complete specific pieces of the project, such as painting, plumbing, A/C, elevator.
12) Supervise projects and task through CBM portal and ensure correct data entry from all users.
13) To liaison with finance, MMD and other group service department to get timely services.
14) Involve in hiring, training and other HR related activities.
15) Any other assignment(s) given by management time to time.
1. Jang Group of Companies
Detail of work at different projects is as under
a) Office construction & Development Karachi
Period from November 2003 to till to date
Position Sr. Manager Const & maint
Assignments a) Main Responsibilities as per summery.
b) Renovation of 12 floors
c) RCC construction of 03 floors
d) Construction of Pent house ( Architect Naheed Mashooq Ullah)
e) Construction of Studio & Renovation of 02 offices in Dubai in Building 02 Dubai Media City
f) Prepared Mock-up of wet area
g) RCC Foundation of boiler, turbine & electrical panel.
h) Planning & sitting arrangement responsibilities for Media Network.
M/s. Builders Associates (Pvt.) Ltd.,
Detail of work at different projects is as under
a) MCB Tower Project Karachi (The Tallest building of Pakistan)
Position Finishing Engineer
Period from November 24, 2001 to November 2003
Assignments a) Start Masonry & Plaster Work
i) Prepared Mock-up of wet area
j) RCC Foundation of boiler, turbine & electrical panel
k) Whole Finishing items including toilet tiles, floor tiles and other finishing of tower
l) Completed finishing works from basement to 23rd floors
Pakistan Housing Project (Contract # PHA 019) at Shabbir Town, Raiwind Road, Lahore
Position Site Engineer / Q.C.
Period October 11, 2000 to September 30, 2001
Assignments
a) Structural Works In structure work I have to execute the following activities
RCC Foundation
Brick Masonry
Formwork
Rebar Fixing
Concrete of Foundation and roof slabs
b) Finishing Works In finishing work I have to execute the following activities
Plastering
Flooring
Ceramic Tiles
Plumbing, Sanitary Fittings & Fixtures
Finalized sub-contractors bills
State Life Building Tower - Faisalabad
The building was consisted of 2 basement, ground + 13 stories
Position Site In charge
Period April 5, 1994 to October 11, 2000
Assignments
a) Structural Works In structure work I have to execute the following activities
Rebar Fixing in piling
Formwork
Rebar Fixing
Concrete of foundation & roof slabs by tower crane
b) Finishing Works In finishing work I have to execute the following activities
Plastering
Flooring (Terrazzo, Marble & Granite)
Fixing of Elevator architrave.
Ceramic Tiles
Faade Works
False Ceiling
Plumbing, Sanitary Fitting & Fixtures
Installation & Commissioning of Geysers
Gas Station and Gas Pipe Lines
Prepared & finalized the final bill.
Prepared all sub-contractors bill
d) Maple Leaf Cement Factory, Iskandarabad (Mianwali)
Position Surveyor
Period April 28, 1993 to April 4, 1994
Assignments
I have to execute the following
Surveying and leveling on conveyor belt
Erection of steel trestle and trusses, weight about 1000 tons from crusher, 2.67 Km long conveyor belt and awarded letter of application from the company
Govt. of the Punjab (Irrigation Department, Khushab Division (Distt Mianwali)
Position Sub Engineer (On Contract Basis)
Period from September 25, 1992 to April 27, 1993)
Assignments
I have to execute the following
Surveying and leveling of 2 KM Feeder Channel Lift Irrigation Scheme.
Excavation
Preparation of bed
Preparation site slopes & berms
Brick lining of beds and side slopes with making profiles