Project: Construction of New Fauji-6500 TPD Cement Clinker line Factory, Tounsa DG Khan.
I have successfully managed and work with Project manager in initiation phase, Planning (scheduling, Budgeting, resource management, risk assessment), execution and monitoring of following Industrial and commercial Structures with other Services.
1. Central control Room Building G+3
2. Lime stone & Clay crusher Building 35m High
3. Coal Crusher building (35m high)
4. 130KV Grid station building G+3
5. Warehouse
6. Water pumping station and treat plnt
7. Weigh Bridge
8. Diesel supply facility.
9. Site living facilities
10. Concrete batching plant (1.5cu.m) and Gantry Crane foundation 800m long
11. Preparing and maintaining BOQ & IPC for client.
12. Chinese-English Interpretation on site with Chinese Engineers.
1. Structural Design, Detailing and Construction Supervision of warehouse Building in Islamabad.
2. Designing, supervision and Estimation of traffic safety signage plan of highways/motorways and expressway including road markings, reflectors, cat eyes, NJB, kerb stone, Antiglare shield, guard rail, fencing, toll plaza construction. I have been involved on following projects of traffic safety works.
· PKM5 Sukkar Multan Motorway, M-15 motorway, M-14 Hakla DI Kahn , M-16 Swat Expressway, N-80 CPEC Link motorway (khushhal Ghar to Kohat
· Gulberg green Islamabad.
· Chenab Orchard Society Gujrat.
Projects: CPHGC 1320MW China Hub Coal Power Project, HUB Baluchistan & BQPSIII 900 MW Combined cycle power plant Karachi Electric, Port Qasim.
I have successfully managed planning (identification of Activities, BOQ, and resource management), construction and closing of following work packages for both Power plants named above in title underline.
1. GIS Control room building G+3
2. Admin Building G+4
3. Steel structure Building G+2
4. OHWT Design and construction 60,000 gallon Capacity.
5. Steel structures (Pipe Rack) Footing and other industrial heavy foundations.
6. Rigid (JRCP) Pavements 20KM.
7. UG Utilities network (Manholes, fresh water supply, sewage, chemical line).
8. UG ducts (Electrical ducts, Strom water ducts)
9. Industrial earthworks including earthing network.
10. Chinese-English Interpretation