خلاصہ

I want to work in an organization where I can maintain and enhance organizational
Productively, developing strong manpower, identifying new scopes and deploying
Professional development program in order to achieve organizational goals as well
as my personal growth objectives.

پراجیکٹس

Start Delta Control Circuit
Rain Alram System , Power Conversion System, Conversion Of 220v In to 12v Dc.

تجربہ

کمپنی کا لوگو
CRO (Control Room Operator)
Zahidjee Textile Mill
فروری ۲۰۲۲ - موجودہ | Faisalabad, Pakistan

Working as CRO (Control Room Operator) in Gas Power Plant of ZahidGee Textile Mill Ltd Sainwala Faisalabad.

کمپنی کا لوگو
Field Engineer Electrical
Orange Line Train Lahore Pakistan
اکتوبر ۲۰۲۰ - مارچ ۲۰۲۲ | Lahore, Pakistan

Working as Field Engineer Electrical in Orange line Train Lahore Project...

کمپنی کا لوگو
Electrical Supervisor
AL-Shayan Technical Company
فروری ۲۰۲۰ - اگست ۲۰۲۰ , United Arab Emirates

Complete Open and under ground Wiring installation of buildings
Complete installation of Lightning in industry and Domestic purpose
Panel Overhauling

کمپنی کا لوگو
Traniee Engineer Electrical
Shahid Mehbob Electrical Contractors SMEC
مارچ ۲۰۱۹ - جنوری ۲۰۲۰ | Karachi, Pakistan

Complete Open and under ground Wiring installation of buildings.
DB DRESSING

کمپنی کا لوگو
Traniee Engineer Electrical
Brother Suger Mill Chunian District Kasur
ستمبر ۲۰۱۸ - مارچ ۲۰۱۹ | Chunian, Pakistan

1-Power House control
2-Turbine Generator starting
3-Synchronizing
4-load shifting
5-Start Delta circuit
6- Reverse Forward circuit
7-DOL circuit
8-Auto Transformer Single step
9-Auto Transformer two steps
10-VFD's Starting

کمپنی کا لوگو
Traniee Engineer Electrical
Tandian Wala Suger Mill Limited Unit Rehman Hajra Muzaffergarh
ستمبر ۲۰۱۷ - اگست ۲۰۱۸ | Muzaffargarh, Pakistan

1-Power House load calculation.
2-Cable Dismantling.
3-H.T motor Mentinace.
4-Surge lights and Sogo lights Mentinance.
5-L.T motor Mentinance .

کمپنی کا لوگو
Interniee
Kot Addu Power Company Limited (KAPCO)
فروری ۲۰۱۷ - اپریل ۲۰۱۷ | Kot Addu, Pakistan

Work as interniee in Eletrical Maintenance Block-1. We worked about following things'
1- Complete study of Gas-Turbine Generator's.
2-Complete Study of V94 Simeon Gas Turbine.
3- Complete Process of Combined-Cycle and
Open-Cycle.
4- Transformers Test and Experiment.
5- Electric Motor Troubleshooting and meggering.
6- Switch yard.

تعلیم

Government College University
بیچلرز, بیچلرز ان ٹیکنالوجی, BS.c Electrical Engineering Technology‎
High Voltage Engineering, Power Plant Technology
CGPA 3.94/4
2017
BISE
انٹرمیڈیٹ / اے لیول, فیکلٹی آف سائنس (پری انجینئرنگ), F. Sc‎
Bio, CHM
درجہ A+
2013
Govt.HS Yaray Wala
میٹرک / او لیول, سائنس, matric‎
Science
درجہ A+
2011

پیشہ ورانہ مہارتیں

ابتدائی Instrumentation & Process Control (IPC)
ابتدائی PLC, Team Motivation, Team Management, Microsoft Word, PowerPoint, Documentation, Data Collection
ابتدائی Programmable Logic Controller (PLC) Training Achieved from Punjab Industrial Training Assurance Cent

زبانیں

ماہر انگریزی
ماہر اردو
ماہر سرائیکی
ماہر پنجابی
ماہر پشتو

آپ کن کمپنیز کی پیروی کر رہے ہیں

مزید دیکھیے