I worked with Pakistan Civil Aviation and ADELTE-The Boarding Company. I'm a goal-oriented person with the eagerness to work in a challenging and team-oriented environment to learn and grow as a proficient, innovative and success driven professional
• Performing preventive,predictive and corrective maintenance of electromechanical Aircraft stand-alone system at New Islamabad International Airport.
• Contribute to the creation and implementation of best practice maintenance vision,strategies,polices,processes and procedures according to installation in order to aid and improve operational performance.
• Read and interpret equipment manuals and work orders to perform required maintenance and service.
• Maintained appropriate inventory of parts for equipment preventing extended down time for facilities.
• Prepared ITBs, RFQs, RFIs, RFTs, proposed cost estimates for biding, calculated man-hours and prepared work plans and schedules.
• Make / prepare technical and financial bids according to the ITB / RFQ documents
• Preparing estimates as per developed norms and working man-hours,Cost controlling,Take off BOQ,quantities & price re-measurement, project costing and review ITB and other
documents.
• Preparation of database of material prices for effective and efficient results.
• Rechecked / reviewed the whole design, made necessary amendments and got approval from consultant and client.
• Supervised installation, testing and commissioning of electrical works.
• Prepare ITP, RFIs and Controlling whole Quality Control/ Quality Assurance Processes.
• Prepared Shop Drawings, Material Submittals
(ProfiCAD,AutoCAD,P6).
• Planning of project schedules for activities of Project.
• Generation of Weekly & Monthly progress reports.
• Designing and installation of equipment and routing for laying of cables.
• Installation, Commissioning and Testing of Passenger Boarding Bridges (PBB), Pre -Conditioned Air Unit(PCA),Ground Power Unit (GPU),Aircraft Visual Docking Guidance System (AVDGS), Integrated Aircraft Support System (IASS) and Gate Operating System(GOS) at New Islamabad International Airport.
• Configuration and calibration of Automatic Visual Docking Guidance System (AVDGS) as per site requirements.
• Documentation for Testing and Commissioning of PBB, PCA,GPU, Integrated Aircraft Stand System(IASS),PCA & GPU Pop-Up-Pits, AVDGS and GOS with consultant and client.
• Communication setup of IASS Control Panel with AVDGS, PBB, PCA and GPU using Network Switches, FL Switches and Media Converters.
• Supervise Laying of Power Cables for GPU, PCA, IASS and AVDGS.
• Design Routing of Optical Fiber, Ethernet and Control Cables for Control Panel IASS and AVDGS according to site conditions.
• Testing and supervision of Communication network for GOS and IASS (Integrated Aircraft Stand Support).
• Interlocking of PBB’s, AVDGS, PCA and GPU Pop-Up-Pits with Control Panels.
• Installation of 630KVA Transformer along with HT and LT cables termination.
• Installation of MV/IO Panel along with HT cable and control cable termination.
• Performed in depth electrical acceptance testing of hardware including continuity and high potential isolation testing.
• Designing and construction of earthing pits for HT and LT side.
• Electrical Load Assessment and computation thereof.
• Carrying out modifications in design of medium/low voltage system as per site requirements.
• Circuit design and cable size calculation according to load.
• Preparation/Arrangement of Samples, Submittals and Technical Specifications.