خلاصہ

Worked as Mechanical ( HVAC FIRE PLUMBING) Expert in "Paragon Constructors Pvt LTD" and leading large scale proj Responsibilities -Review of tender document including the scope of work, specifications, value engineering, tender bulletins, bill of quantities, technical offer, technical clarification, and list of deviation to the specification, list of deviation to the scope of work. - Review the Issued for Construction drawings and other document. - Review of the index of tender document - Review changes between tender and construction document. - Attend all technical meetings (Internal meetings, meetings with the main contractor or with the consultant). - General review of other disciplines, all MEP layouts in order to highlight any problem that might occur. - Prepare the document register of shop drawings related to this discipline. - Prepare the Material submittal schedule. - Prepare the request for information (RFI). - Review all shop drawing. - Check Material Take Off and issue enquiry to Procurement Dept. - Review and submit the technical material submittal forwarded from procurement department. - Follow up on the material submittal approval with the consultant and main contractor and resubmit, if required, any commented material submittal with final approval. - Issue the site requisition of the approved material once the Material Take Off is made based on approved shop drawings. - Make sure the Purchase order for the above issued site requisition is issued. - To clarify with the consultant any discrepancy between various contract documents Project Engineer Responsibilities N. J. Autos Private Limited Karachi, Sindh -Applied lean manufacturing (worked on removing seven wastages) - Collaborated with the engineering team to adjust and modify production equipment - Improved efficiency


پراجیکٹس

Innovative Solution Software House
Contour Software House
Hoshang Pearl Tower
Lucky One

تجربہ

کمپنی کا لوگو
Manager M&P
Paragon Constructors Pvt Ltd
اگست ۲۰۲۱ - موجودہ | Islamabad, Pakistan


Responsible for project management and execution for M&P works.

کمپنی کا لوگو
Managing Partner /Project Engineer
Zum Engineering
جنوری ۲۰۱۹ - جولائی ۲۰۲۱ | Karachi, Pakistan

Responsible to lead project from tendering stage to handing over project.
Responsible for procurement of material.
Responsible for project management.
Responsible for testing and commissioning.
Responsible for quality assurance.
Responsible for meetings with consultant, client, contractor, architect.

کمپنی کا لوگو
Mechanical Engineer
Paragon Constructors Pvt Ltd
جولائی ۲۰۱۷ - دسمبر ۲۰۱۸ | Karachi, Pakistan

Leading Project as an independent and executing HVaC, Fire and plumbing design in high rise building.

کمپنی کا لوگو
HVAC Engineer
Lucky One Pvt Ltd
مارچ ۲۰۱۴ - جون ۲۰۱۷ | Karachi, Pakistan

-Review of tender document including the scope of work, specifications, value engineering, tender bulletins, bill of quantities, technical offer, technical
clarification, and list of deviation to the specification, list of deviation to the scope of work.

- Review the “Issued for Construction” drawings and other document.

- Review of the index of tender document

- Review changes between tender and construction document.
- Attend all technical meetings (Internal meetings, meetings with the main contractor or with the consultant).

- General review of other disciplines, all MEP layouts in order to highlight any problem that might occur.

- Prepare the document register of shop drawings related to this discipline.

- Prepare the Material submittal schedule.

- Prepare the request for information (RFI).

- Review all shop drawing.

- Check Material Take Off and issue enquiry to Procurement Dept.

- Review and submit the technical material submittal forwarded from procurement department.

- Follow up on the material submittal approval with the consultant and main contractor and resubmit, if required, any commented material submittal with
final approval.

- Issue the site requisition of the approved material once the Material Take Off is made based on approved shop drawings.

- Make sure the Purchase order for the above issued site requisition is issued.

- To clarify with the consultant any discrepancy between various contract documents

تعلیم

NED University of Engineering & Technology
ماسٹرز, ماسٹرز ان سائنس, Mechanical (Spec In Energy System)‎
Energy and Power
CGPA 2.8/4
2018
NED University of Engineering & Technology
بیچلرز, , Bachelors of Engineering‎
plant engineering, operation research, operation management, heat transfer, method study, quality control
2012

پیشہ ورانہ مہارتیں

ماہر Business Communication
ماہر Engineering Leadership
ماہر Handling Assignments
متوسط Instruments Drawing

زبانیں

ماہر اردو
ماہر انگریزی

آپ کن کمپنیز کی پیروی کر رہے ہیں