Exceptionally creative and resourceful Electrical Engineer with a stellar record of safety and massive production. Ability to handle multiple projects simultaneously with high professionalism and accuracy. Adept, short and long term electrical system troubleshooting

پراجیکٹس

Industrial projects
Industrial Projects

تجربہ

کمپنی کا لوگو
Deputy Manager Utility And Maintenance
Sapphire Finishing Mills - Apparel Division
فروری ۲۰۱۹ - موجودہ | Lahore, Pakistan

1. Lead diversified team of 25 personnel of entire plant maintenance services covering mechanical, electrical, automation, calibration, validation and engineering store portfolios.
2. Installation and maintenance of HT (11kv) and LT (440v) overhead lines, cables and whole industrial distribution networks.
3. Preventive maintenance of electrical installations like switchgears, whole plant machineries including motor control panels and keeping their documents and records.
4. Repair and maintenance of heavy induction motors including rewinding.
5. Lead entire plant HVAC team operation and maintenance covering 568 tons chiller, Air handling Units, Energy recovery Ventilators, drinking RO plant, Compressed air network
6. Yearly OPEX planning of entire plant of more than 180 Million per annum
7. Establish dashboards to monitor department progress to close fiscal year within assigned budget and assigned breakdown targets
8. Active member of plant core team to establish Manufacturing Excellence Program (MNEX)
9. Execute assigned CAPEX short term & long-term projects

کمپنی کا لوگو
Deputy Manager Engineering-Electrical
US Apparel And Textiles Pvt Ltd
جولائی ۲۰۱۸ - جنوری ۲۰۱۹ | Lahore, Pakistan

1. Supervision of Engineering Department Maintenance team and responsible for Maintenance team management decisions
2. Participation in the development of engineering improvement projects, defining technical equipment (for Production and/or Industrial Services) as part of a multidisciplinary team (preferably including different products and technologies, and both, the mechanical and E&I areas)
3. To follow the progress of Industrial Electrical installations in phases, from project idea, implement and test the final
4. Managing Contract approval for new supplies/ services
5. Cost controlling of different ongoing projects within specified budget
6. Responsible for the Site/ equipment management
7. Energy efficiency in electrical utilities & energy internal audit
8. Check the quality of materials and items purchased locally or imported

کمپنی کا لوگو
Assistant Manager Engineering-Electrical
US Apparel And Textiles Pvt Ltd
جون ۲۰۱٦ - جون ۲۰۱۸ | Lahore, Pakistan

1. Supervision of Engineering Department Maintenance team and responsible for Maintenance team management decisions
2. Participation in the development of engineering improvement projects, defining technical equipment (for Production and/or Industrial Services) as part of a multidisciplinary team (preferably including different products and technologies, and both, the mechanical and E&I areas)
3. To follow the progress of Industrial Electrical installations in phases, from project idea, implement and test the final
4. Managing Contract approval for new supplies/ services
5. Cost controlling of different ongoing projects within specified budget
6. Responsible for the Site/ equipment management
7. Energy efficiency in electrical utilities & energy internal audit
8. Check the quality of materials and items purchased locally or imported

کمپنی کا لوگو
Electrical Engineer
US Apparel and Textiles Pvt Limited
ستمبر ۲۰۱۴ - ستمبر ۲۰۱۵ | Lahore, Pakistan

1. Supervision of Engineering Department Maintenance team and responsible for Maintenance team management decisions
2. To make suitable arrangements to comply with complaints of all machinery and follow up till completion
3. To highlight and make out cost of the equipments consuming large energy and take suitable steps for their replacement
4. Creating electrical preventive maintenance system, organize and controlling preventive maintenance activity and organize electric shift maintenance to ensure that they work and follow engineering preventive maintenance schedule in Engineering Department
5. Look after generators and prepare reports regarding WAPDA shut down, fuel consumption, units, KW during their operation, repair/maintenance overhauling and to maintain log record etc
6. To have a check and balance of critical and non critical load during peak and off peak hours
7. Monitoring and recording the Electric Load of all Machines
8. To ensure the PF (Power Factor) with range to avoid any penalty

کمپنی کا لوگو
Electrical Engineer
Eastern Leather Company Private Limited
ستمبر ۲۰۱۳ - ستمبر ۲۰۱۴ | Lahore, Pakistan

1. Supervision of Electrical Department of ELC RWD/ KV and responsible for repair maintenance in all departments.
2. To make suitable arrangements to comply with complaints of all machinery and follow up till completion.
3. To highlight and make out cost of the equipments consuming large energy and take suitable steps for their replacement.
4. Look after generators and prepare reports regarding WAPDA shut down, fuel consumption, units, KW during their operation, repair/maintenance overhauling and to maintain log record etc for ELC RWD/KV.
5. To have a check and balance of critical and non critical load during peak and off peak hours.
6. To make strategies for any improvement in electrical department.
7. Monitoring all motors repair, rewinding, overhauling tasks and to prepare record in computer.
8. Monitoring and recording the Electric Load of all Machines.
9. Look after the electrical and operational aspects of WWTP (Waste Water Treatment plant) at ELC KV.
10. Check the quality of materials and items purchased locally or imported.
11. Supervise the planned preventive maintenance schedule as per machine aspects.
12. Co-ordination with production and admin staff regarding all aspects.
13. Regular visit of Mechanical store to have check and balance of all the electrical items
14. Replying all mails related to Electrical department.
15. Closely work with mechanical department for the repair / maintenance of electrical when required.
16. Energy efficiency in electrical utilities & energy internal audit.
17. To ensure smooth functioning of Compressor and dry chamber.
18. Daily checking of the sub staff working progress reports.
19. Implementation of Department SOP
20. To ensure the PF (Power Factor) with range to avoid any penalty.
21. To check the amperes of all the power factor penal
22. Monthly checking of Scales and UPS load
23. To coordinate with the IT staff for the camera connections and cleanliness
24. To take daily reading of energy meter
25. Any other task assigned by the Management.

تعلیم

University of Lahore
ایم فل, MS Electrical Engineering Gold Medalist‎
Electrical
مکمل
2018
University of Engineering & Technology
بیچلرز, بیچلرز ان سائنس, BSc in Electrical engineering with honours‎
CGPA 3.8/4
2013
Forman Christian College
انٹرمیڈیٹ / اے لیول, , F.sc(pre.eng)‎
Applied Mathematics
درجہ A+
2009
City Cadet School
میٹرک / او لیول, , Matriculation in Science‎
Science
درجہ A+
2007

پیشہ ورانہ مہارتیں

5+ سال electrical work
5+ سال Excellent communication and interpersonal skills
5+ سال INTERNET SOFTWARE
5+ سال Microsoft Office
2 سال Microsoft Outlook
5+ سال Microsoft PowerPoint
5+ سال Microsoft Word
1 yearMulti-site Team Management
1 yearProject Administration
4 سال Project Co-ordination
4 سال Project Plans
1 yearProject Scope Development
ایک سال سے کمRisk & Compliance Management
5+ سال Troubleshooting Skills

زبانیں

ماہر پنجابی
ماہر اردو
ماہر انگریزی
ابتدائی جرمن

Waqas آپکے جاننے والے

Arslan Faique
Ambition Apparel (The Blue Jeans And Co.