خلاصہ

Dear HR Manager,

I had been awarded by Master degree in Telecommunication Systems with CGPA 3.03 from Session;2012-2014 I had 3 years of Excellent Hand's on Experience ZTE RAN BSS IBS & MW as I had been conscientiously worked on Multiple projects like Mobilink warid merger swap project,Mobilink 2G Swap project,Zong 2G to 3G Swap Project, Zong 3G/4G Rollout Project, Power Swap Project, Telenor 3G Project and got a valuable hands on experience on the following equipment.

1.ZTE BTS ZXSDR BS8910A(RRU Based)
2.ZTE BTS ZXSDR BS8906(RRU Based)

3.ZTE BTS ZXSDR BS8900(RSU Based)

4.ZTE BTS ZXSDR BS8700(RRU Based)

5.ZTE Power Rectifier ZXDU68 W301

6.ZTE 2G/3G/4G Equipement
7.NEC TRANSMISSION 200MB/400MB/1000MB

8.Ericsson & Huawei Transmission Regarding Swap activities

I had worked as RAN Engineer in ZTE from 10 mar, 2016 till present.

I had worked as Swap Engineer in RELACOM from 15 Jun, 2015 till 10 mar ,2016.

I had also been associated with WAJDA as BSS Engineer from may,2014 till jun 2015.


BR//
Muhammad Adeel Malik
Telecom Engineer
cell# 0092 332-2229989
[email protected]

تجربہ

کمپنی کا لوگو
RAN ENGINEER
ZTE Corporation
مارچ ۲۰۱٦ - موجودہ | Multan, Pakistan

Department: RAN
Designation: RAN Engineer
Project: : ZTE MOBILINK WARID MERGER & ZTE MOBILINK 2G SWAP PROJECT
Responsibilities:

Swap Ericsson (6000 family to ZTE BTS SDR BC8910A).
Supervision of BSS(ZTE SDR) equipement\'s installation
Supervision of ZTE IBS(Indoor Building Solution) equipement\'s installation
Responsible for commissioning of ZTE BTS SDR BC8910A
Responsible for commissioning of BBU(B 8200) according to MO data provided
Upgradation ZTE software package files
Enabling 2G/3G VLan,port Setting & E2E ping test through BSC/RNC for media clearence
Deeply understanding of RRU cascading (8863,8881 for GSM,DCS and 3G)
Give site readiness for cut over and maintain plan according to customer demand
Pre & Post alarm verification of the installed ZTE BTS SDR BC8910A through NOC
Responsible for upgradation of site as well as maintaining QoS(Quality of Service)
Check VSWR if some unsuitable readings founds accordingly finds its solution
Responsible for troubleshooting of SDR
Provide technical support to team for troubleshooting of ZTE BSS equipement
Correct radio network fault that leads to performance degradation
Remove Network bottle neck in coordination with RF
Get EPMS training from ZTE & trained subcon others engineers
Responsible for QA/QC
Conduct pre-pat activity for snag audits
Manage Site quality according to customer demand
Make Sure HSE & PPE will be on site
Share the Daily progress report (DPR) with internal higher management regarding installation & dismantling

کمپنی کا لوگو
SWAP ENGINEER
Relacom Pakistan (Pvt.) Ltd.
مئی ۲۰۱۵ - مارچ ۲۰۱٦ | Multan, Pakistan

BSS(ZTE SDR,Rectifier&Battery Bank)Equipement’s installation
Give site readiness for cutover & maintain plan according to customer demand
Responsible for media clearence
Responsible for coordination with transmission dept. in order to clear media
Responsible for coordination with B.SC engineer in order to check the status of site
Responsible for commissioning of ZTE BTS SDR 8700 RRU solution,ZTE BTS SDR 8800/8900 RSU solution
Responsible for upgradation of 3G sites as well as maintaining 2G QoS(Quality of service)
Configuration of ZTE W301 rectifier & rectifier alarms
Responsible for testing & troubleshooting post alarm patching of SDR& Rectifier
Responsible for media clearence
Checking the VSWR(voltage standing wave ratio) & finds its solution if found some unsuitable readings
Provide technical support to team for troubleshooting of ZTE BSS Equipement
Correct radio network faults that leads to performance degradation
Rectification of service effecting alarm of swapped site
Remove issues of the swapped site in coordination with RF departement
Battery Bank backup analysis
Manage site installation quality according to customer demand
Conduct pre-pat activity for snag audits
Maintain PAT & BOQ files and give updates on daily basis
Share the daily progress report(DPR) with customer or internal higher management regarding installation & dismantling
Trained the subcon engineers regarding hardware & software of ZTE
Give training to subcon engineer time by time if any upgradation in system
Manage overall Progress of team and reporting to Project Coordinator

کمپنی کا لوگو
RAN/BSS ENGINEER
Wajda International
مئی ۲۰۱۴ - جون ۲۰۱۵ | Multan, Pakistan

BSS(ZTE SDR,Rectifier&Battery Bank)Equipement’s installation
Give site readiness for cutover & maintain plan according to customer demand
Responsible for media clearence
Responsible for coordination with transmission dept. in order to clear media
Responsible for coordination with B.SC engineer in order to check the status of site
Responsible for commissioning of ZTE BTS SDR 8700 RRU solution,ZTE BTS SDR 8800/8900 RSU solution
Responsible for upgradation of 3G sites as well as maintaining 2G QoS(Quality of service)
Configuration of ZTE W301 rectifier & rectifier alarms
Responsible for testing & troubleshooting post alarm patching of SDR& Rectifier
Responsible for media clearence
Checking the VSWR(voltage standing wave ratio) & finds its solution if found some unsuitable readings
Provide technical support to team for troubleshooting of ZTE BSS Equipement Correct radio network faults that leads to performance degradation
Rectification of service effecting alarm of swapped site
Remove issues of the swapped site in coordination with RF departement
Battery Bank backup analysis
Manage site installation quality according to customer demand
Conduct pre-pat activity for snag audits
Maintain PAT & BOQ files and give updates on daily basis
Share the daily progress report(DPR) with customer or internal higher management regarding installation & dismantling
Trained the subcon engineers regarding hardware & software of ZTE
Give training to subcon engineer time by time if any upgradation in system
Manage overall Progress of team and reporting to Project Coordinator

کمپنی کا لوگو
DT Engineer
LCC Pakistan (Pvt.) Ltd
جولائی ۲۰۱۳ - ستمبر ۲۰۱۳ | Multan, Pakistan

1-Drive Test for pre-launch Optimization sites using TEMS 8.0.3, Drive Test & Frequency Scanning.

2- Documented Reports using MAPINFO 8.5 and approval of sites from Ufone and Huawei.

3- Site Audit reports including site configuration, Antenna Height, Azimuth and tilts.

4- Drive VIP Routes and resolve the quality issues, muting, HO Issues.

5- Optimization includes frequency tuning, cell redesigns, DT analysis to optimize bad patches, parameter audit etc. to ensure optimal QOS.

6- Resolving the Handover issues, Rx Quality, Overshooting and overlapping issues, Quality Drive, Bench Marking and reporting.

تعلیم

Bahauddin Zakariya University
ماسٹرز, ماسٹرز ان سائنس, M.Sc in Telecomunication Systems‎
Wired and Wireless Networks
CGPA 3.0/4
2015

آپ کن کمپنیز کی پیروی کر رہے ہیں