I have 17 years plus experience in Utility Department, Power plant, operations and maintenance also construction experience.I did work at combined cycle power plant 4500mw and 4300mw in Saudi Arabia.I did work on Caterpillars,Cummins Gas and Diesel Generators
Workings as an Asst Manager Maintenence (Electrical, Mechanical and Plumbing) Looking all maintenance of Pace Mall Maintain Generators, Wapda and Solar maintenance records Maintained & look after of Escalators and Elevators. Make a plan of Diesel Generators (Perkins 650kva, 550kva) Maintenance when it\'s Due. Complaints Handled of Every Mall Traders Regarding Maintenance & Solved them.
Working as an Electrical Engineer
Maintain a machinery list with codes
Maintain record of inspection reports and every action is taken timely
Preventive maintenance schedule of all machines, electrical panels,
electrical wiring and generators to be prepared for every year
R & D /Cost reduction planning and execution
Shift Engineer in utility department( power house)
To keep record of Electrical Compliances and take necessary actions
To keep track of all the Audit requirements
To meet different corporations regarding the equipments to be installed
To plan for Gensets Overhauling
Electrical Engineer in Electrical and Maintenance Department
Working and daily inspection in Production Hall
Transformers of PEL Company 2 x 625 kva
Cummins Diesel Generator 1 x 1 MW
Caterpillar Diesel Generator (D3512)1 MW
Monthly Maintenance Diesel Generators
Electrical Supervisor at 4600MW combined cycle power plant installation and construction Monitor the work of electricians and provide guidance Electrical system installation, troubleshooting and repair. Supervision and coordination of field activities Manage installation of permanent power duct bank. Personal Protective Grounding for electric power facilities. Cable tray installation in HRSG. Panels installation STG switchgear room. Cable tray installation and fabrication DCS room in STG building 380kv Ducket Bank installation with 300mm PVC pipe diameter. Air Cooled Steam Condenser cable tray and cable ladders installed. .cable tray 150mm, 300mm, 400mm.Cable ladders 150mm, 200mm, 300mm, 400mm Installed cable tray for diverter Damper of GT Cable tray 100,200,400,600mm LV, MV and HV ducket bank prepared Prepared and installed the channels for cable support inside the LV and MV manhole Fabrication and installation of cable trays and cable laders Cable pulling and termination for AC,DC and Fire alarm system
Working as a Shift Engineer in power plant
Caterpillar Gas Engines,(3516-B) 6 x 1 MW
Caterpillar Diesel Engines, (3512-D) 2 x 1 MW
Cummins Diesel Engine, 3 x1 MW
Work At Control Panels & Installation
Daily Generation & Consumption Report
Monthly Generation & Consumption Report
Weakly Inspection Of All Plant
Checked All Control Panels
Alternator Side Inspection
Engine Side Inspection
Maintain the all system & Trouble Shooting.