خلاصہ

Experienced Electrical Engineer with a demonstrated history of working in the banking industry. Skilled in Control Systems Design, Management, Engineering, Project Engineering, and Electronics. Strong engineering professional with a Bachelor of Engineering.

تجربہ

کمپنی کا لوگو
OG I Officer
Bank Al Habib Limited
جون ۲۰۱۷ - موجودہ | Karachi, Pakistan

• Maximum two years’ experience for Monitoring the maintenance work of nationwide Branches i. e. Electrical, UPS and Solar System.
• Minimum two years’ experience in solar projects.
• Evaluate system generation performance and capacity testing
methodologies for substantial completion of solar power projects.
• Knowledge of new and emerging Battery Energy Storage Systems.
• Completing assigned task of Ramp marking, pillar guard installation and safety work at Warehouse, Bank Al Habib.
• Visiting new sites in order to check progress of HVAC, Switch gear work.
• Minimum one and half year experience in ERP (Oracle data base).
• To perform as facilitate manager for 1MW x 2 Gas Generator Jenbacher and FG Wilson Diesel Generator, HVAC(Centrifugal, Direct Fired and Multi Energy Chillers),SKM AHU, Schneider BMS, fire alarm system and Lift at Center Point Building, Karachi.

کمپنی کا لوگو
Planning Engineer
Reliable Security System (Pvt.) Ltd
اپریل ۲۰۱٦ - مئی ۲۰۱۷ | Karachi, Pakistan

Installation (Internal + External) - Addressable Fire Alarm system, Security (CCTV and Access control), Public Address, Cable Routing.
 Prepare and update project schedule based on the contractual Obligations.
 Set work program and target milestones for each phase based on the project plan.
 Monitor critical activities based on the project schedule and advise project management.
 Prepares and submit updated work program and identify areas of weakness and establishes means and methods for recovery, if any, as well as new critical activities.
 Monitor day to day work progress and prepare the weekly and monthly program and report.
 Maintain and record update of site work progress obtained from Project Manager.
 Prepares monthly report reflecting work progress summary.

کمپنی کا لوگو
Planning Engineer
Reliable (Resco) Security System Pvt Ltd
اپریل ۲۰۱٦ - مئی ۲۰۱۷ | Karachi, Pakistan

- Installation of Electrical Installation (Internal + External) - Addressable Fire Alarm system, Security (CCTV and Access control), Public Address, Cable Routing.
- Involved in the technical and Management supervision highly driven.
- Coordinate with Mechanical, civil, Architect Engineers, Discuss technical aspects of electrical system towards successful completion of project.
- Scheduling: Development of Base Line Schedule using Planning Software PRIMAVERA (P6).
- Preparation of Weekly, Monthly & Three Months look-ahead Schedule. Updating actual Progress and all related information & comparison analysis.
- Following higher management time schedule instructions and advices, reporting work field condition problems & statues to higher management, following activities of other departments in site.
- Coordinate with other Contractor for the fast progress work on site implementation of advanced system and conduct weekly Site Inspection & prepare Monthly Progress Reports

کمپنی کا لوگو
Assistant Electrical Engineer
DS Engineering
ستمبر ۲۰۱۴ - نومبر ۲۰۱۵ | Karachi, Pakistan

- Work in two vertical OK Mills.
- Cable Installations (MV,LV & Control Cables), Panel Termination, Over Load Relay test through Current Injector, Cable test through Megger technique, Earth make.
- Maintaining records and archives to company standards.

کمپنی کا لوگو
OG 1 Officer
Bank AL Habib Limited
جون ۲۰۱۷ - جنوری ۱۹۷۰ | Karachi, Pakistan

(2017 to 2018)
 As a coordinator, contact to relevant department, discussing technical aspects of electrical system towards to keep progress on track.  Preparing financial report i.e. RER, Memo and APR.
 Visiting the sites to verify HVAC and Switchgear progress.  Provide status and issue reports to the Line Manager on a regular basis.
(2018 to 2020)
 Two year Experienced in ERP (Oracle Financials), Preparing purchase order, GRN and move order issue for MEP work.
 Maintenance work i.e. Electrical, UPS and Solar System for nationwide branches.
(2020 to present)
 Installing 5KW to 30KW hybrid solar system in various Branches.
50KW on grid solar and 66KW hybrid system. Covered PVs on parking area at ROB Multan Bank Al Habib.
 Electrical infra-structure of new branches and back offices.
 To work on due diligence report and perform as facilitate manager for 1MW x 2 Gas Generator Jenbacher and 1MW FG Wilson Diesel Generator, HVAC(365 RT Centrifugal, 365 RT Direct Fired and 650RT Multi Energy Chillers), 7.5 KW SKM AHU, Schneider BMS, fire alarm system and seven Lift at Center Point Building, Karachi.
 Performing other duties and responsibilities which are assigned time to time.

تعلیم

Institute of Business Management (IoBM)
ماسٹرز, , MBA 2 Year‎
Industrial and Management
CGPA 3.3/4
2021
Usman Institute of Technology (UIT)
بیچلرز, , B.E Electrical(Electronics)‎
Electronics
2014
Government College of Technology Hyderabad Pakistan
ڈپلوما, ‎
Electronics
مکمل
2009

پیشہ ورانہ مہارتیں

متوسط Civil Planing
متوسط Instruments Drawing
متوسط Oracle E-Business Suite

زبانیں

ماہر اردو
متوسط انگریزی

آپ کن کمپنیز کی پیروی کر رہے ہیں