Do maintance of Caterpillar generator and Jenbacher engine and see all inventories of engineering department
Manage shift,production, maintenance and also despatch batteries to Pak Suzuki and Toyota
see the battery quality
charging time
washing ,testing and coading
and dispatch to pak suzuki
manage all tha eletrical cable
manage all the connection of main cable,panel and LT panels
New plant installation JAR FORMATION , installation of panels ,cable termination
Cable laying , termination of cable, coupling of panels
Install camera, trouble shooting, camera surveillance
Arrange all documents and drawings to the site