خلاصہ

Well-organized good planner good time-manager
Self-aware - always seeking to learn and grow
Conclusive and results-driven creative problem-solver

تجربہ

کمپنی کا لوگو
Industrial Engineer
Silver Star Group
جنوری ۲۰۱۵ - موجودہ | Sialkot, Pakistan

Production Planning and Control (PPC), Resource Management.
SAM calculation and designing process flow chart at product development.
Managing financial planning and cost analysis.
Designing the layout of Operations processes.
Reducing garments rejection and alteration up to 15% to 3%.
Fixing the operators grade based on their performance and criteria.
Developing multi-Skill operators based on their individual interest and maintaining skill Matrix record.
List out low efficiency operators and monitor to improve their efficiency.
Monitoring and line balancing based on capacity and WIP in the line.
Conduct time study to calculate standard allowed minute for operations
Prepare daily production reports to highlight efficiency and identify training needs
Initiates lean manufacturing to balance line and implement 5S
Prepare operation breakdown of different article and set the layout of machines.
Planning day to day production to achieve maximum production.
Knowledge of the implementation of various techniques and quality/ safety standards for improving operations along with cost saving
Quality standards like 6S, 8 Waste, Kaizen, Poka Yoke, and Kanban System etc.
Distribution of work load to operators in order to achieve daily production target.
Simultaneously working towards productivity and quality improvement through Kaizen activities.
FMEA,TPM, JIT, lean manufacturing, Single piece flow concept

کمپنی کا لوگو
Production Engineer
Kohinoor Textile Mill (Pvt)Ltd, Lahore
اپریل ۲۰۱۴ - دسمبر ۲۰۱۴ | Lahore, Pakistan

Final year Project on Productivity enhancement by using Value Stream Mapping (VSM).

Results.
Reduction in transportation of material from 40% to %7%
Reduction in lead time from 30% to 54%,
Reduction in labor Cost from 10% to 20%.

کمپنی کا لوگو
Industrial Engineer
USA appral Pvt Ltd
جون ۲۰۱۳ - دسمبر ۲۰۱۴ | Lahore, Pakistan

Conduct time study to calculate standard allowed minute for operations
Conduct motion study and implement better system to eliminate excess motions
Prepare daily production reports to highlight efficiency and identify training needs
Initiates lean manufacturing to balance line and implement 5S

تعلیم

University of Management & Technology (UMT)
بیچلرز, بیچلرز ان آرٹس, Bachelors in Science Major In Industrial Engineering‎
Production Planning And Control, Lean Manufacturing Systems, Total Quality Management, ,
CGPA 3.59/4
2014

پیشہ ورانہ مہارتیں

2 سال FMEA
2 سال Just In Time
2 سال Kanban System
2 سال Lean Fundamentals
2 سال Production Planning
2 سال TPM, JIT, Single piece flow concept

زبانیں

ماہر انگریزی
ماہر اردو