خلاصہ


To secure a position in your company where my decisions will lead the company to ultimate success


پراجیکٹس

Power theft monitoring using global system for mobile communication

تجربہ

کمپنی کا لوگو
Electrical Engineer
Eastern Spinning Mills Limited Unit-2
جنوری ۲۰۱٦ - جولائی ۲۰۲۰ | Lahore, Pakistan


• Erection of Gas Genset CG170-16 2*1.5MW• Supervise Deemar Engineering fabrication team• Supervise Jameel Electric Industry team• Supervise Enercon team for generator,motor,changeover Panels• Assist Allied Engineering Services team during commissioning & loadtest• Supervise electrical work in new projects at industry• Supervise assigned tasks of electrical supervisor and foremen• Designing electrical systems or their components• Train employees on use & function of electrical equipment• Perform general and recommended electrical maintenance• Maintain the record of recommended preventive maintenance• Resolve technical issues of electric machines, Cummins GeneratorsKTA50,deepsea synchronising panles DSE8610,8660,8660MKIIwithin plant and reporting to Manager• Resolve electrical problems withinstallation,maintenance,replacement of faulty equipment,monitoringof entire electrical equipment,wiring or accessories and maintain therecord accordingly• Read technical diagrams and drawings.• Inspect generators,transformers,circuit breakers and other electricalcomponents.• Preparing specifications for purchase(BOQ) of electrical equipment• Testing and modifying operational electrical machinery,control circuitand equipment• Working with a variety of technicians & Safety Equipment• Meet with other engineers to discuss new possibilities and projectsfor the company• Install new electrical equipment ensuring running efficiently• Maintain technical knowledge by attending educational workshop• Power & Control cable sizing,laying,dressing and termination• Power & Control lugs,glands and thimble sizing• Power & Control cable tray & conduicts• Electrical instruments installation Gensets,ACBs,CTs,electricmotors,Load shed circuit,jacket water and after cooler level switchesand exhaust pressure switch,J/W,A/C differential switches,PT100,airpreheating 3 way valves,J/W electric heaters,solinoid valves.• Busbar extension (Sizing & Weighing)• Solid ground earthing (Cable,Earth pits and Bore)• Installation communication cables& neutral isolation system• Installation of HT/LT panels,switchgears,starting batteries24VDC,DSE8660MKII module,mechanical instrument,PVCfills,louvers for cooling tower and generator foundation pad leveling• Ensure discipline within plant

کمپنی کا لوگو
Trainee Engineer
Eastern Spinning Mills Limited Unit-2
ستمبر ۲۰۱۵ - دسمبر ۲۰۱۵ | Lahore, Pakistan


Power system cost analysis
WAPDA and SNGPL bill verfication
High tension meter reading
Three phase and single phase motor winding & overhauling
Three phase & single phase control and power circuits
Star & Delta connections of induction motor
Maintain the schedule maintenance of Boge Compressors
Understanding the working of Variable frequency drive(VFDs),programmable logic controller(Siemens PLC),LT/HT panels,switch gear,power transformer and protection system
Understanding use of magnetic contactor,thermal overload relay,electronic overload relay,timer,fuse,breaker,sensors
Installation of street lights poles
Take active part in troubleshooting and maintenance jobs during shift

تعلیم

University of Engineering & Technology
بیچلرز, BSc, Bachelors in Science‎
Electric Power and Control System
2015
Faran Model School Jhang.
انٹرمیڈیٹ / اے لیول, , ‎
PRE ENGINEERING
2010
Alhamd model school jhang sadar
میٹرک / او لیول, , ‎
Science
فی صد 91%
2008

پیشہ ورانہ مہارتیں

ماہر Automotive Electrical System Knowledge
ماہر Electrical Troubleshooting
ماہر Electronics Troubleshooting
ماہر Equipment Maintenance
ماہر Malfunctions Identification
متوسط Safety Management
ماہر Wiring Diagrams
ابتدائی استخدام الخريطة

زبانیں

متوسط اردو
متوسط انگریزی