خلاصہ

To pursue a career in dynamic organization putting my all efforts to firms activity to effectively contribute to the optimal growth of the organization.

پراجیکٹس

Electric Power Distribution control

تجربہ

کمپنی کا لوگو
Trainee Engineer
Power Vision Systems (pvt.) Limited
اگست ۲۰۱٦ - موجودہ | Lahore, Pakistan

Along with my professional team, following duties are assigned:
 Assembling of Alternators
 Coupling with diesel engines
 Testing of Generators
*High Voltage test
*Insulation Resistance test
*Voltage regulation test
*Governor Control test
*Temperature Rise of winding
*Sustain overload 10%
*Sustain overload 25%
*Momentary Overload 50%
*Wave shape
*Charging System
 Designing of ATS panels
 Designing of control panels
 Pre-delivery investigation (PDI)

کمپنی کا لوگو
Internee
Schneider Electric Pakistan (Private) Limited
اپریل ۲۰۱٦ - مئی ۲۰۱٦ | Lahore, Pakistan

Assisting with the coordination and execution of tasks while the installation of a substation at PACKGES MALL Lahore
Contractor: SCHNEIDER Substation work contractors
Client Name: PACKGES Ltd.
Project Number: S-31017
Project: PACKGES Lahore Pakistan
I learned the installation of the all the substation equipment such as indoor transformers, substation panels (protection panels, VFD panels etc.) heavy duty cable and cable tray installation.

کمپنی کا لوگو
Shift Engineer
Continental Plastic Industries (pvt.) Ltd
مارچ ۲۰۱٦ - اپریل ۲۰۱٦ | Lahore, Pakistan

Being a shift engineer in the environment of Injection Molding Process, following duties were assigned to me.
 Prepare the daily production report
 Endeavour to reduce downtime of the FCS machines
 Checking of electrical part and grounding of machine connection.
 Supervise the all work activities that involves equipment maintenance and repair
 Actively participates in the Job Hazard Analysis and ensures every team member complies with all Safety Procedures and applicable task-oriented job safety analyses
 Guidance and Cooperation with the technician
 Make sure all machines are producing proper Preforms
 Conduct the meeting with senior engineer twice in a week
 Safety Inspection of portable power tools & other machinery.
 Daily basis checking of the machinery parameters of the heavy equipment activities.
 Always remember the company\'s policy, which is the target zero accident.
 Inspection of necessary work permits whenever to begin the job.
 Customer demand planning
 Put safety precautions before starting the work.

کمپنی کا لوگو
Internee
Lahore Electric Supply Company Ltd
جولائی ۲۰۱۴ - اگست ۲۰۱۴ | Lahore, Pakistan

Assisting with the coordination and execution of fundamental tasks such as Transformer Tap changing, Power factor improvement and Protection of Grid Equipment

تعلیم

University of the Punjab
بیچلرز, , Bachelors in Science‎
power engg
2015

پیشہ ورانہ مہارتیں

متوسط MATLAB Command
ماہر RESTful APIs

زبانیں

ماہر پنجابی
ماہر اردو
ماہر انگریزی