پراجیکٹس

hyundai engineering pvt ltd ,ARL up gradation project

تجربہ

کمپنی کا لوگو
plant operator
Lotte Pakistan PTA Limited
جولائی ۲۰۰۹ - جولائی ۲۰۱۱ | Karachi, Pakistan

• OXIDATION UNIT
PROCESS AIR COMPRESSOR (6 six stages):
• A multistage (SIX STAGES) centrifugal compressor with 18 bar g discharge pressure and 200 t/ hr flow mounted with inter stage cooler.
• Driven by 20MW motor with power sharing process gas expenders.
SUPPLARYMANTRY PROCESS AIR COMPRESSOR
A multistage (FOUR STAGES) centrifugal compressor with 19 bar g discharge pressure and 10 t/ hr flow with inter stage cooler.EFFLUENT treatment area capacity is 3000 m3/hr
Drying Area Rotary Dryer which dries moisture from wet cake CTA to convert it in to powder
OFF-GAS DRYER: Swing bed adsorption towers where descant is used and nitrogen is recovered
EMERGENCY HANDLING:
• Startup, Shutdown, Over-hauling and maintenance handover of plant.
• Emergency handling, (Power failure, Steam failure, Instrument air failure, Demin / cooling water failure, conveying gas failure).
SAFETY TRAINING:
• Permit to work system (cold-work, hot-work, entry-permit, excavation).
• Fire-Extinguishing system (CO2 and DCP)
• Audit of safety equipments.

تعلیم

Shah Abdul Latif University
بیچلرز, بیچلرز ان سائنس, Bsc‎
Applied Mathematics, Chemistry, English
درجہ B
2011

پیشہ ورانہ مہارتیں

ابتدائی Fire Fighting
ابتدائی midrex traning

زبانیں

متوسط انگریزی