Conscientious Project Engineer with a 05-year track record of handling planning, evaluating, and overseeing civil engineering projects. Expertise in Industrial construction, Outlets & Corporate sector finishes, Road Construction, Drainage & infrastructure, and Steel structure including metal deck construction. In project planning, Scheduling, risk management, and cost management. Skilled at analyzing and interpreting information. Sound Knowledge & Experience in Execution
Project The Krislays Saloon & Spa
Project Nature: Project Management
BM+ Five story building of 12,600 Sq ft.
Manage the Interior work of six story commercial buildings with collaborated architect of Naheed Masooqulla.
Get the experience of luxurious salon & Clinical construction including the imported equipment fittings.
Manage the site and all site activities; permit to work to the contractor within the timeline
Inspection of all interior or finishing work
Lead to all teams with parallel work activities
As like under commanding team and work activities, the completion timeline was 15.MAY.2020 but could n’t complete due to COVID-19 according to revised schedule the completion timeline and project hand hovering date is 15.JUL.2020
Manage the above all categories work and lead the team with total command on contractors.
Project: PAUL RESTAURANT flag ship of PARIS. Responsibilities As project engineer manage the over all project with all respect look out the all activities of the project according to the WBS or plan, lead to all team of contractor and coordinate to architect and consultant for expedite the work.
Civil work
Interior work
Electrical work
HVAC work
Mechanical work
Plumbing work
Hotel infra structure Work.
Manage and lead to all above task and contractors. Prepare the schedule for work plan, prepare the (MOM) minutes of meeting, billing, BOQs, and Bar bending schedule, stakeholders management, time management, plan for the parallel activities. Area of project 3600 SQFT Basement+Ground floor.
Project: S.Abdulla Home
Successfully Delivered at 26.04.2019
As project engineer manage the over all project with all respect look out the all activities of the project according to the WBS or planing of schedule. Lead to all team of contractor and coordinate to architect and consultant for expedite the work.
Civil work
Interior work
Electrical work
HVAC work
Mechanical work
Plumbing work
Manage and lead to all above task and contractors. Prepare the schedule for work plan, prepare the (MOM) minutes of meeting, billing, BOQs, and Bar bending schedule, stakeholders management, time management, plan for the parallel activities. Finally handover the project S.Abdullahome tiles and sanitary commercial multistory building which build on area of 22500sft was complete as per the given timeline of schedule in 10 month.
As project engineer manage the all site activity planning, scheduleing, execution, monitoring and collaborative work with descon and Hascol terminal.
Manage the all activity and delivered the task on and before the time of task. Meeting to contractor regarding work tender to utilized the manpower.
Specialist in activities.
Construct Pipping alignment, pipe sleepers, product pump foundation, pits, oil storage tank foundation, culverts, drain channel, dyk wall, control rooms, bar bending schedule and BOQ\'s
Project Bahri town karachi.
design and construct the under ground water tank (UGWT). Culverts, Drains,
Project Motorway M9.
Field work design culvert and drain.
Material lab technician.
Quantity surveyor.
Survey.
With Q&C Bn engrs. At Sher e baqa.
Under col. Kaisar, major rashid rabbani and major asif.
Traffic Manual classified counting. Calculate the traffic flow per hour at motorway m9.
Infrastructure project construct the road.
Survey and material testing and site supervisor at DHA phase8.