خلاصہ

• Managed to deliver 100+ sites of U900 project with complete documentation and got appreciations from Huawei via emails.
• Implemented 50+ MW links with complete documentation( Site report, ATP)
• Managed to deliver U900 survey project with TSSR and Layouts.
• Deliver 3G roll out sites with site reports
• Deliver LTE roll out sites with site reports
• Deployed LTE800 solution in Muscat region and deliver 50+ sites with acceptance
• Build civil foundations for Minishelter solutions
• Deployed Minishelter solutions for 3G/LTE.
• Deployed 3G/LTE on IBS sites with acceptance.
• Installed transmission equipment ATN and link connectivity
• Deployed SDH/DWDM in exchanges as per customer standards
• Deployed Business ONT in government and private offices.
• Implemented access network sites (MSAN).
• Transferred knowledge of network safety to filed staff via trainings
• Arranged EHS trainings for field staff
• Served as a MW engineer in Wajda and deliver MW links

پراجیکٹس

Huawei 2G /3G /4G U900

تجربہ

کمپنی کا لوگو
Implementation Manager/Projects Coordinator
Wajda International Telecom Services LLC
جنوری ۲۰۱٦ - موجودہ | Muscat, Oman

• U900 Network Enhancement Project-Deployment of U900 technology in order to enhance the Omantel wireless network by adding U900 RRUs, Antennas, and DBS3900.
• Antenna modernization-Replacing of tri band and dual band antennas with Hexa band Antennas in order to achieve Antenna modernization.
• U900 Survey and design-Conduct surveys for U900 technology and prepared TSSR and designs for the surveys.
• 3G roll out- Deployed new 3G sites in overall Oman.
• LTE roll out-Deployed LTE new sites in overall Oman.
• LTE 800 (Omantel deployment project 2016)-Deployment of LTE 800 project by using combiner cutover with 2G technology.
• BONT deployment project –Deployment of Business ONTs in different offices/buildings.
• IBS TI project (3G+4G)-Delivered successfully IBS TI 3G+4G project in Oman.

کمپنی کا لوگو
MW Engineer
Wajda International Telecom Services LLC
ستمبر ۲۰۱۲ - دسمبر ۲۰۱۵ | Muscat, Oman

Installation and Commissioning
• Installation, configuration and commissioning of RTN950A, RTN950 and RTN980 (1+0, 1+1, XPIC, SD)
• NMS visibility
• E1 Test
• Bit Error test
• Troubleshooting of MW links.
• 2G and 3G Services configuration
• Traffic shifting from Existing MW link to Huawei MW link
• Connectivity with ATN, CX and OSN



 LOS and Engineering survey Experience (Work at Relacom pvt limited Pakistan)
• To clear LOS between MW links(Flash ,Flag, Path survey, Zoom In and Zoom Out )
• To check feasibility installation of MW dish
• To collect information of existing BTS (Model, Type, configuration)
• To collect information of existing power available (AC & DC ,Rectifier)
• To collect information of existing grounding
• To check availability of space for new equipment
• To make detailed site layout and TSSR
• To provide best solution on bases of existing information

تعلیم

Center for Advanced Studies in Engineering (CASE)
بیچلرز, , BSC in Electrical Engineering‎
Telecommunication Systems
CGPA 2.6/4
2009

پیشہ ورانہ مہارتیں

متوسط Project Coordination

زبانیں

ماہر انگریزی

آپ کن کمپنیز کی پیروی کر رہے ہیں