DG Cement

工作经历

公司标识
Proposal Engineer
 IKANENGINEERING SERVICES LTD
Dec 2019 - 代表 | Lahore, Pakistan

·        Calculation and Prepare the cost sheet for direct material, direct.indirect manpower,sub contract,consumable,rental vehicles,charge out tools,mob/demob cost etc.
 Site visit as per inquiry and prepare technical clarifications.
Quantities take off from drawings/data sheets and    specifications for piping,steel structure,tanks,pipe support,isulation,painting,equipment,scaffolding.
·        Coordinate with the supply chain for material requirement and hire subcontractor for job submission as per the site/job activities like scaffolding,insulation,painting,PWHT,NDT,engineering design,fabrications,machining etc.
 ·        Raise RFQ and Verifying the material rates and specifications from the sub-contractors, as well as the suppliers.
        Float and handle pre‐bid & post bid clarifications.        Prepare and analyze proposal in light of bill of quantities, scope of work, construction schedule provided by client.·        Preparation of commercial proposal consist on Term & conditions, taxes….etc.         Preparation of Technical proposal consists on Project Schedule, Project Deployments, Organization Chart, HSE Plan and policy, QA/QC Plans, Temporary site facility sketch. ·        Estimation of tenders for minor / major shutdown activities for any kind of modification and replacement.  Command on estimating the fabrication jobs such as pressure vessels, tanks, plant piping steel structure. 
· Estimation of ASME coded (U, R) Stamp/APL jobs.         Coordination with Civil and E&I department. 





公司标识
Estimation Engineer
 RAVI GREEN ENGINEERING LTD
Aug 2019 - Dec 2019 | Raiwind, Pakistan

·      Calculation and Prepare the cost sheet for direct material, direct.indirect manpower,sub contract,consumable,rental vehicles,charge out tools,mob/demob cost etc.
 Site visit as per inquiry and prepare technical clarifications.
 Quantities take off from drawings/data sheets and    specifications for piping,steel structure,tanks,pipe support,isulation,painting,equipment,scaffolding.
  Coordinate with the supply chain for material requirement and hire subcontractor for job submission as per the site/job activities like scaffolding,insulation,painting,PWHT,NDT,engineering design,fabrications,machining etc.
  Raise RFQ and Verifying the material rates and specifications from the sub-contractors, as well as the suppliers.
Float and handle pre‐bid & post bid clarifications. 
Prepare and analyze proposal in light of bill of quantities, scope of work, construction schedule provided by client. ·    Preparation of commercial proposal consist on Term & conditions, taxes….etc. ·        Preparation of Technical proposal consists on Project Schedule, Project Deployments, Organization Chart, HSE Plan and policy, QA/QC Plans, Temporary site facility sketch.         Estimation of tenders for minor / major shutdown activities for any kind of modification and replacement.  Command on estimating the fabrication jobs such as pressure vessels, tanks, plant piping steel structure.      Estimation of ASME coded (U, R) Stamp/APL jobs.  Coordination with Civil and E&I department. 


公司标识
In charge Production
 HAROON ENGINEERING COMPANY
Aug 2018 - Aug 2019 | Lahore, Pakistan

Haroon Engineering is a Fabrication setup.Here 
fabrication of Oil Storage Tanks,Heavy duty Steel  Structure,Oil Heater,Cyclone,STC Container,Steel  Frames,chemical Storage Tanks

公司标识
Quantity Surveyor
 IKAN ENGINEERINGSERVICES LTD
Nov 2015 - Aug 2018 | Lahore, Pakistan

·        Receive the work order along with drawings
 ·      Prepare Bill of Material
         Demand of Material through SAP
         Revision in Plan(if work order revised)
         Prepare of Technical Delivery Schedule(if needed)
         Prepare of Cutting Plans
        Prepare of Packing List
        Clarification of Drawings from client or coordinator     Revision in Plan as per availability of material in Market

公司标识
EstimationEngineer
QADRI GROUP OF COMPANY
Apr 2013 - Nov 2015 | Lahore, Pakistan

·        To receive inquiry after assigned by the marketing manager.
·        Calculation and Prepare the cost sheet for direct material, direct.indirect manpower,sub contract,consumable, etc.
·        To get information regarding inquires for the fulfillment of all technical criteria from customer.
·        To calculate weight for purpose of Cost Work Sheet
·        Discuss machining time for new job with workshop engineers Cross check actual cost worksheets.Vs Estimated.
·        Cross check quotation draft,drawings after purchase order for evaluate risk impact(quotation vs manufacturing)
·        Technical clarification with Design and engineering department regarding dawning issues
·        To report to Manager Marketing any major deviations observed in estimated and actual data.
·        To look after cost data base actual and estimated.
·        Update all material srate from supplier
·        Site visit as per inquiry and prepare technical clarifications.
Quantities take off from drawings/data sheets and    specifications.
·        Prepare and analyze proposal bill of quantities, scope of work, construction schedule.

公司标识
Manufacturing Process Planner
QADRI ENGINEERING LDT
Oct 2008 - Apr 2013 | Lahore, Pakistan

·        Inspection of Manufacturing Sequence & estimated time,according to requirement of Drawing Specifications /Instructions for (Machining & Fabrication) jobs of Sugar Mills (Export)Steel Mills,Chemical and Cement Plants. To coordinate with work shop Supervisor and Quality Assurance,Inspector for discuss Manufacturing Sequenceof new jobs.Drawing study for Tooling and Jig/Fixture Purpose.Manage the Work load over the team.To Coordinate with PPC,Quality and Design office, regarding the,execution Order,Drawing,Templates,Project reportsetc.To attenddaily departmental meeting Prompt decision making for problem solving during operations on the shop floor.Firmly applied manufacturing and quality plan with collaboration Quality department.Provides manufacturingin for mation by compiling, initiating, sorting,and analysing production performancerec ordsand data.
 Maintain machine loading plan capability & priorities as per,machine loading plan,mutually discussed with central Planning&processing department to achieve the targets gate out.
To execute any other job assigned by management.as below Erecting of 2nos CNC floor Boring Machines in workshop. Execution of sub assemblies of cane crushing sugar mills

公司标识
Production Planning Supervisor
HASEEB WAQAS ENGINEERING LTD
Apr 2006 - Oct 2008 | Nankana Sahib, Pakistan

· I have experience in Material Estimation,Materialinden
Coordination with Formans,design office,purchase dept.Running jobs status report to managerworks,on daily base.Supervision of Machining & Fabrication Parts and Equipments of Sugar Mills,Boiler,Chemical,Distillery Plant Heavy duty Trash Rack Cleaner Machine. A project of Hydle Power station Mainwali .Its Material,arrangement,execution of Machining Fabrication parts and their assembly on shop floor.Modification in Distillation area of Distillery Plant. modification project of Distillation area ASML Distillery           Plant.Nankana sahib.As a Coordinator with Chine\'s Team

公司标识
Draughtsman
HASEEB WAQAS ENGINEERING LTD
Mar 2003 - Apr 2006 | Nankana Sahib, Pakistan

I have Draughting experience of Centrifugal Pump,Parts and Equipment\'s of Sugar Mills,Boiler,Chemical,and Distillery Plant.

学历

Prestonuniversity
学士, 理工学士, ‎
Mechanical Engineering
2014
GCT Railway Road
大专, ‎
Mechanical Engineering
Completed
2002
Govt.H.SSchool
大学入学/0级, , ‎
(science)
1999

技能

初学者 ASTM, API’s, ANSI
中级 Handling Assignments
中级  Auto Cad
中级  Internet browsing
初学者  Pipe data pro
初学者  SAP
初学者  Solid Edge St4

语言

中级 英语
熟练 旁遮普语
熟练 乌尔都语