概要


Results-oriented professional with progressive experience leading engineering innovation for high-growth organizations. Expert in instrumentation and control, automation, commissioning, system design and development. Astute in installing Honeywell and Rosemount transmitters, Masoneilan and Fisher control valves, field junction boxes, switches, gauges and flame detectors. Adept at spearheading multiple complex projects in line with budget and time constraints. Conversant with creating and modifying overall engineering processes to increase productivity and controls through process improvement. Demonstrated ability to calibrate and maintain a diverse array of instruments.Skilled in executing preventative and corrective maintenance plans, testing various electrical systems, reading blue prints, drawings, and schematics, and following electrical codes.



My key skills includes Electrical & Instrumentation Engineering, Business Plan Development, Preventive Maintenance, Continuous Improvement, Project Management, Risk Identification & Mitigation, Operations Optimization, Quality Assurance, Cross-Functional Team Leadership and Problem Resolution


My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such, I would welcome a discussion regarding opportunities with your organization that fit my background.


项目

Pak Arab Refinery MCR Revamp Project / ATA-04
KPD-TAY OGDCL ATA

工作经历

公司标识
Area Engineer E&I
Descon Engineering Limited
Jun 2018 - 代表 | Mehmood Kot, Pakistan


Area Engineer E&I
Project: Pak Arab Refinery MCR Revamp Project / ATA-04 | Client: Pak Arab Refinery, Qasba Gujrat, Pakistan
Design construction methodologies and daily, weekly and monthly look a-head plans via close collaboration with the construction management team. Deliver strategic direction and guidelines to the management in leading instrumentation pre/post installation testing, such as isometric, method statement, JSA, data sheets, hookup, loop, logic, and P&I drawings. Install Okazaki and WIKA thermocouples, pressure, temperature and level gauges, vibration switches, local indication panels, and Ionization type pilot flame detectors along with local indication panels. Formulate, update, and deliver reports to the management in a timely manner via close collaboration with planning, execution, and QAQC team members. Successfully install limit, pressure, and level switches as well as terminate field instruments, such as temperature, pressure, flow, DPT, and level transmitters of various manufacturers. Perform all activities in accordance with HSE requirements, PPEs, UOP, and other organizational guidelines. Update and retain schedule throughout duration of project while ensuring awareness among PM and team regarding load and manpower availability.
Led, educated, scheduled, and managed high-performing 60 team, including supervisors, fabricators, fitters, technicians, tube benders, and helpers.
Successfully installed Honeywell and Rosemount pressure, Masoneilan and fisher control valves, field junction boxes, flow, and temperature transmitters along with cable trays/laying, calibration, and impulse piping/tubing.
Ensured dismantling, overhauling, testing, and reinstallation of hundreds of control, on-off valves and damper actuators by designing and executing effective strategies.
Acted as an integral member of biggest shutdown in Pakistan in 45 days time frame at Pak Arab Refinery Ltd and completed renovation of project within time.
Raised refinerys production capacity from 100,000 BPD to 120,000 BPD and RON of refinerys products, while maintaining Pakistani crude and of existing major equipment.
Supervised over 1,300 instrument activities in pre-shutdown and shutdown periods of all process & utility areas.
Oversaw E&I project progressive invoices, tray support installation, perforated cable tray, cable laying, gland, testing, and termination while ensuring cable routing and laying as per cable schedule routing plan of various cables.Area Engineer E&I, 2019Project: K PD-TAY Plant Annual Turnaround 2019 | Client: K PD-TAY OGDCL, Tando Allah Yar Khan Pakistan
Held full accountability for overseeing resources, manpower, and scaffolding erection for all E&I activities, installing field junction boxes, and resolving client issues in a timely manner. Played an integral role in maintaining everyday log book of progress and conducting field evaluations and assessments while attending significant meetings with clients and team members. Supervised RIT system and distributed manpower according to the work front available.
Ensured accurate diagnosis and swift resolution of client issues while performing activities in accordance with standard guidelines and specifications.
Oversaw and accomplished disassembling, renovation, adjustment, and re-installation tasks of 156 Pressure Safety Valves within five days.
Achieved bottom line results by streamlining and executing all engineering and project activities while following PPEs, HSE, and other defined guidelines.
Assured maintenance and calibration of various equipment, including pressure safety valves, motors, switches, control valves, and pressure/level/flow transmitters maintenance of transformers.

公司标识
Instrument Internee Engineer
Pak Arab Refinery Ltd
Feb 2017 - Mar 2018 | Mehmood Kot, Pakistan


Played an integral role in overseeing vendor services and providing proper reports to the Maintenance Superintendent, E/I Supervisor, and OIM. Analyzed estimated expense for maintenance activities and facility upgrade/renewal while overseeing financial aspects of the maintenance of DCS system and deliver guidelines to optimize budget. Executed preventive/special maintenance programs as well as examined technical results of control systems equipment. Collected and entered information for updating facility and equipment management. Delivered first-rate support to CCR in overseeing and following DCS operations while presenting records in the maintenance database in a timely manner. Liaised with unit reporting structure with Company and DCS Service provider to facilitate in commissioning new plant and DCS configuration.
Recognized and retained minimum stock levels of spares and consumables while ensuring notification of spare parts needed onboard, on the basis of programmed activities and operating conditions.
Ensured reporting of deficiencies and malfunctions to the E&I Supervisor while examining technical/spares issues.
Developed and maintained effective working relations with the DCS provider and devised solutions related to eventual bottlenecks, deficiencies, and non-conformities to E&I.

学历

Iqra University
学士, Bachelors in Engineering, B.E Electronics‎
Electronics
CGPA 2.7/4
2016
BISE DG Khan
中级/A级, 理学院(工程预科), Intermediate‎
Pre-Engineering
所占比重 64%
2011
BISE DG Khan
大学入学/0级, 科学, Matriculation‎
Science
所占比重 71%
2008

技能

中级 Administration Knowledge
中级 Analytical Skills
中级 Caliberating Instruments
中级 Conversation Awareness
熟练 Cooordination Skills
熟练 Handling Assignments
中级 Instrumentation
中级 Lab Knowldge
中级 Majoon Making
中级 Planning Operations
熟练 Presentation Skills
熟练 Record Keeping
中级 RESTful APIs
中级 Technical Project Leadership
中级 Writing Skills

语言

熟练 英语
熟练 乌尔都语
中级 Saraiki