概要

• Matriculation from Federal Board, Islamabad. 2008
• Diploma of Associate Engineer from Punjab Board of Technical Education Lahor.2011
• B.Tech (Pass), From NED University of Engineering & Technology, Karachi. 2014-15
• B.Tech (Hons) In Progress From Indus University.

项目

Lakhani Presidency

工作经历

公司标识
Assistant Resident Engineer (Central Administration ) Management .
KGS , ST-19 ,Khayaban -e-Saadi Boat Basin ,Clifton Karachi
Dec 2017 - 代表 | Karachi, Pakistan

• .Preparation of Feasibility studies, Budgetary costs and Estimates, BOQ, BOM,
For various Civil structures and projects.
• Preparation Payment Schedules, Comparative Statement ,work order etc
• Preparation of tender documents, Contracts, Specifications as per
Requirement of Projects.
• Analysis of DPR from sites as per Construction schedule and preparation of
Daily Reports and Project reports.
• Verification of Contractor’s bill, quality as per tender specifications, site
Measurement verification and material consumption verification
• Reconciliation and As-built drawing preparation.
• Ongoing cost analysis of maintenance and civil repair works.
• Coordination with Design, Purchase, and Execution for timely deliverable
Study and checking of drawings and execution drawings and records
for revision.
• knowledge of Cameras PTZ,,Built ,Doom , Mount,& DAY/NIGHT Cameras
• Strong knowledge Mechanical, Electrical, Plumbing new and repair maintenance
• AC, chiller Plant, Central AC system Repair work
• Experience of 100 KW Projects of Solar Panels Work with REON GSS.

公司标识
Assistant Construction Superintendent (Central office ) Management
The Layton Rahmatulla Benevolent Trust ( LRBT ) ,37-C, Sunset Lane No.4 Phase – II Extension, 24t
Oct 2014 - Dec 2017 | Karachi, Pakistan

• Construction Site’s supervision ,with Electrical ,Mechanical, Plumbing work
• Carry out the technical feasibility / assessment (site identification, material,
labor, transportation, supplies and Arrange skilled and unskilled labour for construction execution
• Preparation of drawings, BoQs ,comparative statements ,work order, weekly/monthly reports ,MBs,Runing bills ,final Bills,MRN,GRN & cost estimates ,Rate analysis, Payment schedule of infrastructure schemes as per organization commitment & set standards
• Analysis of construction material e.g. elemental composition, dimensions & quality etc according to drawing & specification.
• Assist in conducting market survey for proposed materials availability, unit rates of material/labours and provide realistic estimates of the proposed activities of project
• Ensure the layouts, levels and all activities at site both pre & post construction to know whether construction work is being done according to drawings and specifications or not.
• Analyse and prepare plans for material requisitions for Different stage of site.
• Good knowledge of Civil electrical. Plumbing, Mechanical Repair maintenances Control all domestic staff for smooth organization

公司标识
Quantity surveyor, Documents Controller
Lakhani Builders Dalamia road Karachi
Mar 2017 - Nov 2017 | Karachi, Pakistan

Quantity surveyor, Documents Controller
Making of BOQ ALL Civil MEO. Verifying Running Bills .Documents Controller

公司标识
Project Manager
Haroon & Co.
Feb 2013 - Oct 2014 | Karachi, Pakistan

Haroon and Co private Construction Company .I was working with 2013 to 2014 as a project Manager .
Collaborating with engineers, architects etc. to determine the specifications of the project
Negotiating contracts with external vendors to reach profitable agreements
Obtaining permits and licenses from appropriate authorities

公司标识
ASSISTANT ENGINEER
Khalid and associates
May 2011 - Feb 2013 | Karachi, Pakistan

Site Inspections, Preparation B-0-Q’s Variation Orders, Payment, Monthly, Daily, Weekly, Progress Reports, contracts, Sub Contracts Issues,
On site work execution and managing the resources, building layouts, construction of Complete buildings, Preparation of BB schedules, dealing with Subcontractors, (15-C Muslim, 48-C Bukhari ) at DHA Karachi.
Site Inspection of complete make B-0-Q housing project, Storm Water drainage system, Water supply, Roads, Overhead Water Tanks, Drains, Septic tanks, Stone Masonry retaining walls, etc.
Completion Survey, Site Plan and Site Work check as per drawing.

学历

Indus University Karachi
学士, 技术学士, B- Tech Honers (Civil ) Technology‎
FLUID MECHANICS–II, STRUCTURAL ANALYSIS-I , CONCRETE TECHNOLOGY , BUILDING AND TOWN PLANNING , SURVEYING–II,
所占比重 75%
2018
NED University of Engg and Tech Karachi
学士, 技术学士, B-Tech (Civil ) Technology‎
DIFFERENTIAL EQUATIONS AND INTEGRAL TRANSFORMS , FLUID MECHANICS–I , GEO TECHNIQUES AND APPLIED Geology, STRENGTH OF MATERIALS , SURVEYING–I , STRUCTURAL ANALYSIS-I, CONCRETE TECHNOLOGY, HIGHWAY ENGINEERING ,
等级 A
2015
Pak Poly Technical Institute (PPTI)
中级/A级, 普通科学学生, Diploma of Associates Engineer (DAE)‎
Mathematics, RCC, Construction
所占比重 76%
2011
AL MUSTAFA SECONDARY SCHOOL
大学入学/0级, 科学, Matric‎
Biology, Physic Chemistry, Mathematics
等级 B
2008

技能

5+ 年 Critical Thinking
5+ 年 Collaborative Problem Solving
5+ 年 Enthusiasm to learn
5+ 年 Leadership qualities
5+ 年 Outstanding time management skills
5+ 年 Passionate about work
5+ 年 Project Management
5+ 年 Strong Analytical Skills
5+ 年 Technical Competence
1 yearAuto Level Instrument
3 年 AutoCAD Architecture
5+ 年 communication skill
5+ 年 Computer skills
4 年 Corporate - Hospitals
3 年 Experienced in water supply & drainage area
5+ 年 Home Construction
5+ 年 Honest and punctual
5+ 年 MS Excel
5+ 年 Planning Budgeting & Forecasting
5+ 年 Quantity Surveying
2 年 Surveying
5+ 年 Time management
5+ 年 Vendor Management Experience

语言

熟练 乌尔都语
中级 英语