概要

I am a highly prudent and technically sophisticated Electrical Engineer with over 12 years of hands-on working experience in project management, high voltage, extra high voltage, medium voltage and low voltage electrical designing, project and site management, procurement, electrical engineering consultancy, supervision, testing and commissioning of electrical equipment such as auto transformer, distribution transformers, medium and low voltage switchgears, ring main units, generators, motors, solar panels, and air compressors. Proven track record of leading teams of main contractor and subcontractors in the execution of complex electrical installation projects from inception through completion as well as Development & modification of electrical services design to coordinate with requirements.



  • Defining electrical design project requirements for developing mega infrastructure, scheduling deliverables and tasks, hiring cross-functional teams, managing project budgets, and maintaining Live substations/power plants equipment’s such as Transformers, EHV circuit breakers, Disconnectors/earthing switches, Instrument transformers, Poles, Streetlights & safety equipment, overhead conductor, and underground cables.

  • A technically sophisticated professional with expertise in Microsoft office (word, Excel, power point), MATLAB, Digsi, and Omicron software.


My key skills include Project Management, Strategic Planning & Analysis, Quality Assurance/Control, Electrical Engineering, Operational Manual/Reports, Preventive Maintenance, Electrical Design & Equipment, Bidding Documentation, Plant Installation & Commissioning, Equipment Testing & Maintenance, Cross-Functional Leadership and Renewable Energy Studies


My professional background and great industrial exposure coupled with an excellent track record makes me an ideal candidate for executive roles. As such I would welcome a discussion regarding opportunities with your organization that fit my background.

项目

500kV switchyard for 1180MW BHIKKI CCPP, 1230MW Balloki & 1230 MWH.B.Shah

工作经历

公司标识
Sr. Engineer Electrical
National Engineering Services Pakistan (Pvt.) Ltd. (NESPAK)
Sep 2012 - 代表 | Lahore, Pakistan

·          Design review of Tubular conductor for 500/220/132kV Rahim Yar khan Substation, earthing system for 500/220/132kV Rahim Yar Khan substation, and CT/VT Marshaling Kiosk for 500kV Rahim Yar Khan substation.
·          Design review of hardware and connectors for 500/220/132kV Rahim Yar Khan Substation; firefighting (SERGI System) for 500kV shunt reactor and 500/220kV, 220/132kV autotransformer and 132/11kV power transformer.
·          Controlled and protected panels schematic drawings review of 500/220/132kV Rahim Yar Khan substation.
·          As a senior engineer completed the Testing & Commissioning of 132/11kV FIEDMC substation; ensured factory acceptance tests (FATS) of 250MVA(220/132kV) autotransformer and 6.3MVA (132/11kV) power transformer.
·          Supervised factory acceptance tests (FATs) of AC & DC system for 500/220/132kV Rahim Yar Khan Substation; factory acceptance tests (FATs) of DC system for 500/220kV New Lahore Substation.
·          Prepared Bidding Documents for 11/132kV, 135MW Taunsa Hydro Power Project; Bidding Documents of 500kV Substation for RLNG based 1180MW CCPP BHIKKI Power Plant.
·          Reviewed Bidding Documents of 500kV Substation for RLNG based 1223MW CCPP BALLOKI Power Plant and Bidding Documents of 500kV Substation for RLNG based 1230MW CCPP Havali Bahadur Shah Power Plant.
·          Evaluated bidding documents of 500kV substation for RLNG based 1263MW CCPP Jhang power plant.
·          Witness the Testing & commissioning of 500kV BHIKKI, 500kV Balloki and 500kV Havali Bahadur Shah substations.
·          Directed base and detail design review of 500kV Substation for BHIKKI, BALLOKI, Havali Bahadur Shah and 1263MW Jhang RLNG based Power Plant.
·          Gained and utilized acute knowledge and engineering experience at RLNG based 1180MW Bhikki, 1223MW Balloki and 1230MW Havali Bahadur Shah CCPP Power plants.
1180 MW CCPP BHIKKI and 1223 MW RLNG BASED CCPP BALLOKI:
·          Base and detail Design Review of 500kV Switchyard
·          Ensured 500kV switchyard complete testing including switchyard equipment and control and protection Scheme
·          Testing of 550MVA GSU Transformers (Siemens Make), Auxiliary Transformer & Main Cooling Water Pump
·           Functional and Relay Testing of GSU & Auxiliary Transformer and Generator
·           Testing of 9HA.01 Generator and MV & LV panels
·          Installation of Generator and Rotor
·          Testing of Auto Transfer Scheme of Auxiliary Transformer

公司标识
Sr. Engineer Electrical, 220kV Grid station Burhan
National Engineering Services Pakistan (Pvt.) Ltd. (NESPAK)
Aug 2011 - Sep 2012 | Lahore, Pakistan

·          Led civil works, erection, testing and commissioning of 160MVA, 220/132kVthree phase autotransformer; the scheme for conversion of 220kV double bus double breaker scheme into one and half breaker scheme.
·          Managed civil works, erection and testing of equipment, such as Disconnector/Earthing Switches, current transformers, voltage transformers and surge arrester, CT and CVT circuit verification.

公司标识
Engineer Electrical- 500Kv Sheikh Muhammadi Peshawar - Pakistan
National Engineering Services Pakistan (Pvt.) Ltd. (NESPAK)
Jul 2011 - Dec 2011 | Peshawar, Pakistan

·          Supervised the Civil works for addition of 3x150MVA Auto transformer bank (ATB-3) at Sheikh Muhammadi Grid-station Peshawar, also managed and completed installation of 450MVA Autotransformer bank.
·          Led the installation of high voltage equipment including Current transformers, Capacitor voltage transformers, Circuit Breakers, Disconnector/Earthing Switches, and Surge Arrester etc.
·          Oversaw the complete civil work, erection, testing and commissioning of 220KV switchyard high voltage bus work for addition of transformer bay and complete erection and testing of 160MVA, 220/132kV three phase transformer
·          Spearheaded the complete teasing and commissioning of all above said equipment/schemes/functional testing.

公司标识
Engineer Electrical - 500kV Ghakkar Substation - Pakistan
National Engineering Services Pakistan (Pvt.) Ltd. (NESPAK)
Jan 2009 - Jun 2011 | Lahore, Pakistan

·          Led construction activities of equipment foundation, control house buildings, Trench layout etc., completed Testing and Commissioning of Siemens / ABB make Relays, Control Panels and Local Control Cubical etc.
·          Ensured installation/erection of 500/220/132kV equipment/high voltage bus-bars; commissioning of 700KVA, 415V 3 phase Cummins Make Generator for auxiliary supply of 500/220/132kV Substation.
·          Installed, tested and commissioned LV& MV switchgear panels and DC system including battery banks & battery chargers for 220V, 110V and 48V. Witness the complete functional testing of substation equipment.
·          Supervised the complete testing of Switchyard equipment e.g., Current transformers, Capacitor voltage transformers, Circuit breakers, Disconnecting Switch, Earthing Switch, etc.
·          Supervised the complete erection and commissioning of 500/220KV Transformers & 220/132KV Siemens make Autotransformers and 132/11kV Siemens make power transformer.

学历

UET Lahore PK
学士, 理工学士, ‎
Electrical Power
所占比重 70%
2008

技能

初学者 Ability towork in teamas wel as individuals.i have courage to achieves great challenges
熟练 Cooordination Skills

语言

中级 英语