To be always creative and develop multifunctional skills for betterment of company.
Always to be innovative, hardworking, and adoptive. To work in dynamic environment. Theoretical knowledge with practical Experience of professional Engineering life. Experience the working with whole Team and individual Experience along the way.
Planning and Execution of all Electrical and Instrumentation Works on Site as per drawings
including.
Installation and Commissioning
Cable laying process.
Cable Termination.
Megger and continuity checking. Cable Tray Primary and Secondary Rout Installation.
Cable Laying (MV, LV, Control, and Shield) of Electrical and Instrument at both ends.
Installation of Local Control Stations (Magnetic Starter, Socket Box, Local Push Buttons, Start up Signal Board) Jbs and Bag filter controllers
installation of MV/LV Motors (Raw Mill main Vertical, Pre-Heater I.D Fan, Coal Mill).