Experienced Civil Engineer with a demonstrated history of working in the Construction industry like MRC, NESPAK and SPARCO. Skilled in ETABS, Primavera, Ansys, AutoCAD and Microsoft Project. Energetic professional with a Bachelor of Science (B.S.) focused in Civil Engineering from University of Engineering and Technology Lahore (UET).
Project Name:Umm-e-Ilyas Hospital, Muzaffarabad.
Responsibilities:
Project planning and tracking work progress.
Execution as per project specifications.
Material submittals and approvals.
Project subcontractor\'s management and supervision.
Communication with stakeholders regarding project needs and goals.
Contributing to the planning and development of project.
Supporting the coordination and management of project.
Researching information as required.
Keeping track of and reporting on project progress.
Completing any tasks assigned by the project manager in an efficient and timely manner.
Liaise with project manager to maintain project schedule and efficacy.
Coordinate with the project manager following project execution.
Project Name:Neelum Jhelum Hydro Electric Power Project(Design Office) (969MW)
Responsibilities:
Review of shop drawings of different structures including Headrace Tunnel, Tailrace Tunnel, T-junction, Surge shaft Tunnel, Assembly chambers, TBM Tunnels, Bifurcation and Cross cuts.
Design of concrete lining to shotcrete transition area.
Design of Concrete lining of high-pressure grouting area in tunnel.
Collecting and organizing of data consists of FCR, SI, NCR and DCN from project sites.
Preparation of construction drawings of NJHPP.
Preparation of record drawings of Headrace Tunnel, Tailrace Tunnel, T-junction, Surge shaft Tunnel, Assembly chambers, TBM Tunnels, Bifurcation and Cross cuts.
Review of as built Drawings submitted by Contractor.
Preparation of weekly, monthly and annually progress report.
Random Site Visits.
Project Name:Neelum Jhelum Hydro Electric Power Project (C3 Site) (969MW)
Responsibilities:
Construction supervision of following components of the project.
Heavily reinforced concrete works of Powerhouse comprising of 4 No. of units.
Transformer hall.
Concrete lining of Headrace tunnel, Tailrace tunnel, Penstock tunnel, Bus Bar tunnels and Vertical surge shaft using the slip Formwork.
Check reinforcement according to drawings and Bar Bending Schedule.
Check formwork of pour before concreting according to drawing.
Supervise pouring of concrete.
Calculate quantity of reinforcement, formwork and concrete.
Verify contractor bills.
Prepare daily progress report.
Project Name:Irrigation Project LBDC ICB-02 (Rehabilitation of LOWER BARI DOWAB CANAL)
Responsibilities:
Preparation of Bar bending Schedule.
layout of the RCC Structure according to Drawing.
Cutting of steel according to the Bar bending Schedule.
Laying of reinforcement according to the BAR bending schedule and Drawing.
Check the Formwork of Pour before concreting.
Supervise the pouring of concrete.
Execute Piling according to Reverse Rotary Method.
Maintain the Quality of Work.
Preparation of Contractor\'s bills
Preparation of Monthly Progress Report.
Keep a good relationship with consultants and client.
Execute Construction of Diversion.