Trouble shooting and maintenance of Turbomachs Taurus 60 Gas Turbine, Dresser Rands Steam Turbine, HRSG boiler & Enerprojects Gas compressor, Jenbachers Gas & Duetzs (HFO + DIESEL) engines.
Study & Troubleshooting of Excitation, Synchronization, Control system, Protection schemes & Logics.
Testing & Calibration of SEGs and SCHNEIDERs protection relays.
Troubleshooting of M.V & L.V Switchgear, VCB, ACB, & SF6 circuit Breaker, Motor Control Centre (MCC), Auxiliary Service Panels, ABB, Siemens and Grundfoss L.V motors up to 400KW.
Calibration & Testing of Instruments e.g. transducers, control valves, pressure switches, level controller and switch.
Prepare and review Preventive and Corrective Maintenance Plan.
Maintain stock level of spare parts for preventative Maintenance.
Prepare new electrical designs and do modification in Electrical system as per plant requirement.
Conduct Feasibility study, report writing of projects and site supervision.
Conduct internal technical audits and supervise external audits.
Project planning, implementation and execution.
Drawing and documentation management.
Insure safe working environment and compliance with plants HSE/ISO Standards.

工作经历

公司标识
Senoir Assistant Manager
Gatron Industries Ltd.
Jan 2015 - 代表 | Hub Chowki, Pakistan

Experienced in project Management, Good understanding of Instrumentation, Electrical system design and installation of electrical machinery and the related mechanical equipment. Operational knowledge of standards. Able to prioritize work and manage multiple projects under budget and time constraints.

Commissioning of 03 JENBACHER JGS 420 BO5 (each 1870KVA) at Gatron Industries Limited.

Meeting with Vendor and reporting higher management about the progress of project.
Cable sizing, earth pit, designing LV Switchgear Pane , cable tray installation, complete control and power cable laying and cable termination.
Modifications in the existing circuit as per the condition onsite.
Designing the control circuit of switchgear panel as per requirement.
Checked the interlocks for the isolators and breakers.
Carried out protection tests of the Alternator.
Testing the Generator Off-Load, On-Load up to the base load of the Generator.
Compilation of commissioning reports.

Load management system
Commissioning of Simplex and Duplex (10 Tons Capacity) Boiler.
Installation and commissioning of level radar system in furnaces and HFO Tanks for exact measuring.
Modification in all Duetz Engines modified over voltage relay to the control system as per plant requirement.
Installation of CCTV Cameras for monitoring of Power House.
Re-commissioning of JGS 620 after 60K Major Overhauling.

学历

Sir Syed University Of Engg. & Technology Karachi.
学士, 理工学士, B.E (Electronic Engineering)‎
Electronics, Electrical Machinery, Power Electronics
CGPA 2.8/4
2014
Govt. Aisha Bawany Collage
中级/A级, 理学院(工程预科), PRE ENGINEERING‎
Chemistery, Mathematics, Physics
等级 B
2010

技能

熟练 Digital Games Knowledge
初学者 Grid Systems
初学者 Handling Assignments
熟练 Machine Program Handling
熟练 Process Operations
熟练 Troubleshooting