概要

I worked as Electrical Engineer at the erection and commissioning of Combined Cycle Power Plant. With the client NESPAK and Contractor Power Construction Corporation of China. 1230 MW CCPP Haveli Bahadur Shah has the latest technology where two 9HA Turbines of General Electric (GE) have been installed with Albario Engineering Pvt. Limited.
Albario Engineering Pvt. Limited is a leading Engineering Company specializing in Electromechanical Contracting, Operations & Maintenance, Engineering, Sourcing, Project Management, and Services Business (To Support Installed Base). 60+ Years of Experience in Energy Sector. 5,000+MW Power Plants Installed and under Construction.
I also worked at Chiniot Power Plant (62.4MW Gross, 2x 155 TPH, 110 BAR (A), 540°C BAGASSE FIRED BOILER) in the operations department.

工作经历

公司标识
Electrical Engineer
Albario Engineering (Pvt.) Ltd.
Sep 2016 - Sep 2018 | Jhang, Pakistan

• Team Lead of Electrical QA and QC as well as Execution of Cathodic Protection Project.
• Coordinator of AEPL to manage manpower supply team provided to General Electric for the commissioning and maintenance of 9HA G.E Turbine.
• Detailed study of the commissioning drawings and reviewing of electrical drawings as per standards and local authority.
• Review of ITP (Inspection and Testing Plan) as per contract code.
• Reviewing technical documentation (specification, data sheet, and inspection data sheet) for electrical equipment.
• Installation of 500KV switchyard (substation).
• Installation and Commissioning of 20 KV: 500 KV Transformer of 550 MVA.
• Installation and Commissioning of SF6 Breakers, Disconnecting Switches, CTs, PTs, Lightning Arrestors, Surge Counters.
• Working on the installation of switch gears and Vacuum Circuits Breakers.
• Conducting all inspections as per approved ITP for the cathodic protection of HSD Oil Tanks and Cooling Water Pipe Line.
• Installation and commissioning of Impressed Current Cathodic Protection for the Cooling Water Pipeline.
• Controlling of all documentation regarding QA and QC of the cathodic protection project.
• Installation of Mix Metal Oxide Cathodic Protection Electrodes.
• Installation of Test Pile and Potentiostat.
• Verification of Civil foundations for Test Pile, Junction Boxes, and Potentiostat.
• Installation and commissioning of Impressed Current Cathodic Protection for the outer wall of HSD (High-Speed Diesel) Oil Tank Bottom.
• Issuing NCR’s for the works executed against the project specifications and standards.
• Installation of Star Delta Auto Starters of 3-Phase Motors.
• Megger Test (Cable, Motor, Transformer).
• Attending weekly meeting with the client representatives and the contractor.
• Supervision of electrical workshop.
• Power Distribution, Load Management, Troubleshooting and Maintenance of all the electrical equipment on site.

公司标识
Trainee Electrical Engineer
Chiniot Power Pvt. Ltd
Feb 2016 - Sep 2016 | Chiniot, Pakistan

Lead field operators, and performed same duties on different parts of Power Plant.
• Operation of 132KV Switchyard of Double Bus Single Breaker Scheme.
• 132KV, 11KV and 400V electrical switchgear operation.
• Operation of Protection panel.
• Operation of Control Panel.
• Operation of 30/40 MVA OLTC Transformers.
• Isolators, SF6 Breakers, CTs, PTs, Lightning arresters, Bus Coupler and Surge Counters.
• Boiler and Auxiliaries.
• Water treatment plant.
• Ash Handling system.
• LV Room.
• GT Hall (Lube and Jacking oil system).
• Trainings of LOTO, Fire Fighting, Basic lifesaving & chemical handling.
• Draw single line P&IDs of complete plant on MS Visio 13.
• Wrote the comprehensive report at the end of the contract, which explains the working of all the sections of Power Plant.

学历

HITEC University Taxilla
学士, 理工学士, Bachelors in Science‎
Contact Lens
CGPA 2.1/4
2016

技能

初学者 Risk Management and Planning

语言

熟练 英语
中级 Saraiki
熟练 旁遮普语
熟练 乌尔都语

关注的公司