概要

Had a good working experience in field of engineering. Ability to do all development tasks, managing & monitoring production tasks & meet the targets as well as problem analysis in detail.

项目

Generator Load Bank 800 kW

工作经历

公司标识
Electrical Engineer
Power Vision Systems PVT Ltd
Nov 2017 - 代表 | Lahore, Pakistan


Job Description
Projects:
Generator Load Bank (Project Length= 04 Months, Completed in Dec 2018_
Harness Test Bench
Relay Test Rig
Working, Testing & Troubleshooting:
Generator Testing
Engine Testing( Dyno Testing)
KUBOTA Engines Thermocouples Testing & Troubleshooting
ECM Engines wriring & Testing
Documentation & Other Tasks:
To plan and manage all activities of the Generator Assembly Line.
Preparation of Generator check sheets, Equipment check sheets, Daily Torque Wrench check sheets, Safety calendar, Accidents monitoring sheet, SOP of Generator, PAC-V Sheets, PDF Sheets of Generator components, Equipment SOP & their Implementations at Generator Assembly Line.
BOQ's development for different projects .
To monitor preparation of AMF panels as per defined SOPs.
To monitor in process & final inspection of AMF panels.
To monitor coupling of generators & installation of Harnesses & AMF panels.
To monitor & approve Generator Testing done on resistive load.
Implementation and monitoring of calibration.
To check ISO 9001:2008 system implementation & control records.
To prepare all Docs relating to ISO implementation.
Currently working on implementation of HSE (OHSAS 18001:2007 & ISO 14001:2015) in company.
Monitoring and enhancing the product Quality.
Maintaining Quality and System Record.
Preparing Inspection plan.
Preparation of Activity Plan.
Monitoring of Activity Plan.
Preparation of Process Quality Control Table-1 (PQCT-1).
Preparation of Process Quality Control Table-2 (PQCT-2).
Preparation of Flow Boards According to SOPs. 19) Kaizen Implementation.
Improvement Report of Department.
Kaizen Implementation.
Preparation of Risk Assessment of Department(Electrical & Machine Shop).
Preparation of Associate Skill Competence Chart
Preparation of Machine Shop documents i.e Manufacturing SOP of fuel tank & Engine Canopy, Equipment Check sheets, Safety monitoring sheets etc.
All tasks related to development of Generator Assy Line.

学历

University of Lahore
学士, 理工学士, BS in Electrical Engineering‎
Electrical Engineering
2018

技能

初学者 AutoCAD
初学者 Automation Languages
熟练 Bill of Material Creation
熟练 Bill of Quantity(BOQ)
熟练 Food Knowledge
中级 Generator Assembly & AMF Panels
中级 Knowledge of Electrical Machines
初学者 Matlab
中级 Technological Skills

语言

熟练 英语