To work in dynamic and challenging environment with a well-recognized organization. To acquire the practical skill by applying my theoretical knowledge in the best regard of the organization, and utilize my skills effectively relevant to my education.
Working towards long term objectives of cost reduction, continuous Improvement and various improvement projects that include:
• SMV Management System
• Layout Developments
• FMEAs
• Line balancing
• Total Productive Maintenance
• SMART KPIs Development
* Calculation SAM (Standard Allowance Minutes).
* Calculation of floor efficiency.
* Evaluation of existing production target and fix a new production target.
* Preparing daily production reports, Monthly improvements reports with graphical presentation.
* Worked with departmental SD on a project to reduce wastage of fabric in cutting department.
* Worked with departmental SD on a project of calculation & implementation of Net-Net, Net and Gross weight of each and every consumer pack.
Final year Project (Study of QMS and Implementation of 5s):
Study the quality management system of lucky Tex and identifies the barriers that reduce the effectiveness and efficiency of quality management system through personal observations, questionnaires and analyze of documents and prepare a proposal of suggestion to overcome these barriers.
Also implement 5s methodology with help and coordination with QMS department in cutting, checking and packing departments.
Study the Raw material for tyre formation.
Calculate the SAM (Standard Allowance Minutes).
Quality control and Quality assurance.
Production planning and control.
Inspection and finishing.