概要

I'm capable of doing hard work with complete devotion for the better development of the organization, like to take challenging tasks so as to assess my own capabilities and want to provide benefits to my organization & for career growth.I am very keen to learn things and try to understand things. I enjoy being part of a team and love to take responsibilities.

项目

Speed Control of motor using mobile phone
Design and simulation of Renewable Energy resources with National Grid.

工作经历

公司标识
Trainee Production Engineer
cocacola beverages pakistan Ltd.(Multan)
May 2017 - Jul 2017 | Multan, Pakistan

Working in Supply Chain section on Production Lines of RBG and PET with machines operated through HMI.
Trouble.shooting of any type of electrical faults in the production line.
Troubleshooting of any type of faults in generator section, grid control rooms.
Good knowledge about the operation of whole plant.
Responsible for CIP and change overs
Daily faults report writing
GMP

公司标识
Graduate Trainee
Multan Electrical Power Company
Jun 2016 - May 2017 | Multan, Pakistan

Responsible of recovery from defaulted consumers.
Responsible for controlling line losses.
Responsible for controlling Theft.
Responsible for maintenance and installation of Distribution Transformers, AMR boxes, Energy meters, HT and LT distribution lines.

公司标识
Graduate Trainee Engineer
GENCO’S HOLDING COMPANY LIMITED Northern Power Generation Company limited.
Jun 2015 - Sep 2015 | Muzaffargarh, Pakistan

• Study of power generation and transmission.
• Knowing about generators, exciter systems and motors.
• Study of turbines and geological survey of power plant.
• Working in switch yard and knowing about protection and distribution systems.
• Finding and resolve the fault of transmission system of 11/33/400kv lines.
• Checking the fault of skin effect and corona effect and Ferranti effect.
• Checking Switch-gear and maintenance.
• Good knowledge about Air CB, Sf6 CB, V CB. Oil CB.
• Checking Breaker open or close and breaker pressure.
• Troubleshooting of Control Room.
• Checking the Transformer leakage, cooling system and T-voltage regulate.
• Installation of single phase and three phase wiring.
• Estimation of Electrical works & Making time sheet.
• Installation of home appliances.
• Open and short curcuit test.
• Good knowledge to understand Electrical Drawings.
• Manage the technicion and labour.
• Good Knowledge to find out the fault in Conventional and Addressable systems.
• Submitted Daily report and weekily report.
• Inspection & Testing Fire Extinguisher DCP & CO2 Water and Foam.

学历

NFC Institute of Engineering & Technology, Multan
哲学硕士, MS Electrical Engineering‎
Electrical Power, Mathematical Modeling and Stimulations, Research Methodology
Completed
2018
Islamia University
学士, 理工学士, BSc ELectrical Engineering‎
Electric Power and Control System, Digital Signal Processing, Communication System
CGPA 2.7/4
2015
Punjab college,Multan.
中级/A级, 理学院(工程预科), FSC‎
Mathematics, Physics, Chemistry
所占比重 80%
2011
Nishat High School, lodhi colony, Multan
大学入学/0级, 科学, matric‎
Physics, Chemistry, Biology
所占比重 89%
2009

技能

初学者 Etap
初学者 Handling Assignments
初学者 Hmi
初学者 Instruments Drawing
初学者 MATLAB Command
初学者 Proteus
初学者 Report Writing Skills
初学者 SCADA

语言

熟练 旁遮普语
熟练 乌尔都语
中级 英语