概要

Operations Engineer with 2+ years of experience of working and troubleshooting of main and auxiliary equipment’s of Steam turbine and Super critical Boiler. Possess a B.E. in Mechanical and expertise in 1320 MW Capacity Thermal Power Plant. Looking to leverage my knowledge and expertise and skills continuously to play an important role in fulfillment of organizational goals in a challenging and work friendly environment.
In-depth knowledge of all the aspects of functionalities of machines and the major mechanical equipment's.
Expertise in managing the entire team including technicians and production workers for completion of assignment.
Well versed with the legal issues and safety standards to be followed during the projects.

项目

Amplitude and frequency analysis of a body using image processing Matlab

工作经历

公司标识
Operations and Maintenance Engineer
Port Qassim Electric Power Company
Sep 2016 - 代表 | Karachi, Pakistan

Sep 2016 - Present
Responsible for the operations and maintenance of coal fired power plant during commissioning and erection phase of 22094T supercritical, Once through, type boilers by Harbin Boilers (Model HG-2094/25.4-HM16), 2660 MW 4 cylinder, condensing Steam Turbines (Model N660-24.2/566/566), and 2660 MW Water-H2-H2 cooled generators (Model QFSN-660-2-22C).

Key Responsibilities
Assisted in the Commissioning and debugging of plant auxiliaries including Centrifugal Pumps, PD pumps, Air Compressors, static and variable pitch axial Fans, centrifugal type fans, and Vacuum Pumps.
Inspection and monitoring of unit pre-startup, startup and shutdown operations in compliance with SOPs.
Routine field inspection and monitoring of plant auxiliaries and reporting abnormalities to Shift Chief Engineer.
Ensuring the pre and post SOPs have been followed for startup and shut down of plant auxiliaries.
Ensuring the plant auxiliaries run at optimum parameters for best performance through co-ordination with chief Engr.
Maintaining daily inspection log of plant parameters and understanding the behavior of auxiliaries under different Environment conditions

公司标识
Intern
Space and Upper Atmosphere Research Commission (SUPARCO)
Jun 2015 - Jul 2015 | Karachi, Pakistan

Design, fabrication and structural analysis of Solid rocket motor casing through ANSYS. Moreover, calculation of stresses and strains generated in the casing and selection of appropriate thickness on the basis of measurement. In order to test solid rocket motor casings (SRMCs) under different conditions several testing techniques were studied.

学历

National University of Science and Technology
学士, 技术学士, BE in Mechanical‎
Mechanical Engineering
CGPA 3.7/4
2016
superior science college
中级/A级, 理学院(工程预科), F.SC‎
Engineering
所占比重 83%
2012
public school hyderabad
大学入学/0级, 科学, S.S.C‎
Computer Science
所占比重 85%
2010

技能

初学者 Ansys
初学者 Handling Assignments
初学者 Instruments Drawing
初学者 Pro-E
初学者 soldiworks

语言

中级
中级 旁遮普语
中级 信德语
熟练 乌尔都语
熟练 英语