To become part of a dynamic and progressive organization, which offers challenging working environment where one can utilize energies and competences in a positive direction and contributes towards overall objectives of an organization.
• Operation of Power Plant BOP\'s & Auxiliaries. G.E Gas Turbine 6FA & Siemens Steam Turbine SST-900
• Attended 20 Days of Shutdown Overviewed Electrical Works Transformers Testing, Power Centers inspection
• Attended 45 days of Shutdown Major Inspections of Steam Turbine Gas Turbine , Generators Testing ,
132 Switch Yard Maintenance.
• Operated precision measuring instruments and electrical and electronic testing devices.
• Connected and disconnected wiring..
• overviewed Installed equipment and new and replacement parts.
• Overviewed preventive and corrective maintenance to maintain proper equipment safety and functionality.
• Overviewed Recorded type and cost of maintenance and repair work.
• Inspected , Motors , MOV’s, Transformers LV, MV HV Switch Gears, UPS, During Yearly Shutdown/Outage
Network Testing , ODF's and SFPs Installation stock managment