概要

I have extensive fourteen years pre & post contract experience in various sectors including, Hydropower, Highways, Thermal Plant, Oil&Gas and Infrastructure projects. Currently I am participating for renewable energy at World Bank Funded Projects, Gabral Kalam and Madyan HPP. My responsibilities include Feasibility study, Bidding documents, Evaluation of bidders etc. in compliance with World Bank standard. I possess a good understanding about FIDIC and specification of NHA, WAPDA and SSGCL. I have exceptional proficiency in report drafting, cost calculation, quantification, claims and resolving commercial and contractual issues.

项目

Construction Facility Works at DHA City Karachi (DCK)
Golen Gol Hydropower Project
720 MW Karot Hydropower Project

工作经历

公司标识
Quantity & Cost Engineer
SMEC International Pty Ltd
Oct 2022 - 代表 | Peshawar, Pakistan

World Bank funded Projects:207 MW Madyan Hydropower Project88 MW Gabral Kalam Hydropower Project.Preparation of BOQ, Engineer’s Estimate, rate analysis, PQD, Tender documents, bid evaluation, PC1, Pre and Post Contract protocols, all in accordance with World Bank funding guidelines

公司标识
Principal Contract Engineer
Power Construction Cooperation of China, Ltd.
Aug 2022 - Sep 2022 | Rawalpindi, Pakistan

Name of Project: Diamer Basha Dam Project.
The PowerChina-FWO JV awarded MW1 works in August 2020 which including Construction of 272 meter Roller Compacted Concrete (RCC) gravity dam which is the highest RCC dam in the world, construction of Spillway (14 gates), Diversion tunnels, headrace tunnels, sedimentation flushing tunnel, permanent & temporary roads & bridges, design and construction of additionally 21 MW Tangir Hydropower. The total cost of MW1 is 2.7 Billion USD.
I managed all aspects of Contract Administration, preparing claims, drafting reports, letters, and Minutes of Meetings including overseeing the QS team for IPCs. I also liaised with clients and consultants to ensure effective contractual communication.

公司标识
COMMERCIAL ENGINEER
China Three Gorges
Sep 2020 - Aug 2022 | Rawalpindi, Pakistan

Name of Project: 720 MW Karot Hydropower Project.
EPC Contractor, Yangtze Three Gorges Technology & Economy Development Co. Ltd. (TGDC) is part of China Three Gorges Corporation (CTG) https://www.ctg.com.cn/en/.My responsibilities were preparation of Milestone Application, Interim Payment, Variation order & Claim management, hiring third parties, verification of Sub contractor invoices, letter drafting & maintaining correspondence, Monitoring contracts & commercial related issues for the whole project. Maintaining online database.

公司标识
QUANTITY SURVEYOR
SMEC International Pty Ltd
Dec 2016 - Aug 2020 | Rawalpindi, Pakistan

Project Name: 720 MW Karot Hydropower Project.
Client: Karot Power Company Limited (KPCL)
EC Contractor: Three Gorges Economy Development Company (TGDC)
P Contractor: China Machinery & Electric Company (CMEC).
EPC Cost: 1.28 Billion USD
The project is designed exclusively for power generation under Build Own Operate Transfer (BOOT) basis with a concession period of 30 years. It has an asphalt core rock-fill dam of 95.5 m height, 26700km2 catchment area, a separate spillway, intake structure, 3 diversion tunnels(12.5d), 4 power tunnels and a surface powerhouse(164.9x27x60.5m) containing 4x180MW Francis turbines with mean annual power generation of 3,206 million kW/h. Storage of Reservoir 1.52x108m3. Lenders of the project are China\'s Silk Road Fund, International Finance Corporation, The Export-Import Bank of China and China Development Bank. The EPC/Turnkey project. PPIB Project. Part of CPEC. My responsibilities were verification of milestone, payments, project variation, escalation, cost claim, and other related contractual matter as per FIDIC Silver for EC and P Contractors.

公司标识
SENIOR QUANTITY SURVEYOR
BAK Consulting Engineers
Mar 2014 - Dec 2016 | Chitral, Pakistan

Name of Project: Golen Gol Hydropower Project.
Project is funded by three donors OPEF Fund for International Development (OFID), Kuwait Fund for Arab Economic Development and Saudi fund for Development. The scheme designed for the generation of 108 MW consisting of three units in one phase. Public Sector Project.
My responsibilities are: Checking of IPC’s, Escalation, Rate analysis and VO for all Lots i.e. hydraulic structures, tunnel, road, bridges, Powerhouse, grid station, Switchyard, transmission line (132 & 220kV), electrical and mechanical work.

公司标识
PROJECT QUANTITY SURVEYOR
Habib Rafiq (Pvt) Ltd
Jan 2014 - Feb 2014 | Karachi, Pakistan

Name of Project: Construction Facility Works at DHA City Karachi (DCK)
Responsible for Three Projects. Preparation of IPCs and prepare bill for Sub-Contractors. Bar Bending Schedule. Calculate the quantities of road cut & fill sub-base, WBM, base course, asphaltic work, electrical, water supply sewerage, drainage System etc and DHA building work

公司标识
QUANTITY SURVEYOR
RMC Construction Company
Sep 2013 - Jan 2014 | Takhtbai, Pakistan

Name of Project: Construction of Flyover at Takht Bhai on N-45.
Preparation of Interim Payment Certificate, Bar Bending schedule, Shop drawing, dealing with client and EA consultant according to work and extension of Flyover 225m to 425m (25x17) revision of B.O.Q, realignment of Flyover and prepare complete drawing for extended portion with coordinates. 84 piles 153 girders. To Controls contractor’s price value.

公司标识
QUANTITY SURVEYOR
MYCO Engineers Construction Co
Jan 2013 - Sep 2013 | Dadu, Pakistan

Name of Project: POGC Rehman EWT (Extended Well Test) Plant Facility.
Project: POGC Rehman EWT (Extended Well Test) Plant Facility.
EPC Contractor: Project Support Services Asia (Pvt) Ltd.
Client: Polish Oil and Gas Company Pakistan.
This facility is handling 15 MMscfd of Raw Gas, about 10 BPD of condensate and 200 BPD of produced water on EPCC basis according to specifications of Sui Southern Gas Company Limited (SSGCL). PGNiG Partner JV with Pakistan Petroleum Limited (PPL). MYCO Engineers was Sub-Contractor with EPC PSS. My responsibilities were; preparation of IPC, rate analysis, shop drawings, B.B.S and weakly & monthly work schedules. Calculation of quantities like as pad strip foundations, evaporation pond, condensate storage, firefighting system, gathering manifold, metering skid, air compressors, inlet, discharge piping, cutting & Filling of plot areas included Residence. PGNiG on 25th June 2013 has commenced gas production from Rehman reservoir block # 2667-7.

公司标识
QUANTITY SURVEYOR
Abdul Karim & Sons (pvt) Ltd
Aug 2012 - Jan 2013 | Guddu, Pakistan

Name of Project: 747 MW (Gross) Combined Cycle Power Plant.
EPC Contractor: Harbin Electric International Company Ltd.
AKS was Sub-Contractor with China Company (HEI). Preparation of Interim Payment Certificate, Shop Drawings, Bar Bending & Work Schedules etc and getting approval from Chinese Engineer. Bills for Sub-Contractors, Calculation of quantities of RCC work like as Cooling Tower, Pump House A, Pump House B, Intake & Open Channel, Mini Coffer Dame, Chlorination Building, C.W Pipe Line RCC pipe line syphon well, Drainage & Discharge Culvert for Thermal Power Plant. Supervision of site work included Management of Project activities & Contractor’s invoices. EPC Project.

公司标识
QUANTITY SURVEYOR
Associated Consultancy Centre (Pvt) Ltd
Jul 2011 - Jul 2012 | Ziarat, Pakistan

Name of Project: Kach-Shahrag-Harnai Road Project ICB-07.
Responsible for Checking of Interim Payment Certificate, Escalation Payment Certificate, Shop Drawings and Bar Bending for Three Bridges , 269 culverts 12 causeway 84 retaining walls and other protection & drainage work. Due to shortage of consultancy staff at site I was also responsible for supervision of survey and quality work Calculate Quantity of Earth Works, Structural works. Variation Order at the project and Prepare the Monthly Progress Report. Record maintain and File Keeping. Road Length 93 KM

公司标识
QUANTITY SURVEYOR
Rakhshani Builders (pvt) Ltd
Sep 2010 - Jul 2011 | Loralai, Pakistan

Name of Project: Sanjawi-Dukki Road Project. ICB-09.
Preparation of Interim Payment Certificate. Prepare the Bills for Sub Contractor. Plotting the X-Section. Preparation of Variation order. Preparation of Bar Bending Schedule & Shop Drawing for four bridges, culverts and syphonwell. Inspection of site work including checking of Steel and Layout as per drawings. Dealing with client according to the work. 29 KM Road, 123 Numbers of Culverts and Four Bridges. Project was funded by ADB under the BRDSP (Balochistan Road Development Sector Project)

公司标识
QUANTITY SURVEYOR
Associated Consultancy Centre (pvt) Ltd
Jun 2009 - Sep 2010 | Loralai, Pakistan

Name of Project: Sanjawi-Dukki Road Project. ICB-09.
Checking of Interim Payment Certificates. Checking of Road X-Section. Checking of Different Bar Bending Schedules. Checking of different Structure works. Preparation Monthly Progress Report.
Worked with Contractor (Rakhshani Builders (pvt) Ltd) (Without pay) at the same duration and calculate the super elevation, curves, making the level sheets and complete survey work with contractor’s survey staff and plotting the X-section, shop drawing (Auto CAD) and bar bending schedule with contractor’s QS.

学历

Bahauddin Zakariya University
学士, Bachelors in Engineering, B. tech‎
Civil
2012
Quaid-e-Azam college of engineering and technology
大专, Diploma of Associate Engineer DAE‎
Civil Engineer
Completed
2009

技能

熟练 2D Drwaing
熟练 Analytical Skills
熟练 Bill Of Quantities
熟练 Bills Verification
中级 BIM Measure
熟练 BOMS
熟练 BOQ
熟练 Civil Coordination
初学者 Civil Planing
熟练 Civil Supervistion
熟练 Clain Management
熟练 Construction Planning
中级 Contract Engineering
中级 Contract Management
熟练 Contracts Administrators
熟练 Cooordination Skills
熟练 Cost Estimation
熟练 Data Processing
熟练 EOT Claim
熟练 EPC
熟练 Escalation Payment
熟练 Estimation & Proposal
熟练 FIDIC
熟练 FIDIC Red
熟练 FIDIC Silver
熟练 FIDIC Yellow
熟练 Furniture Drawings
熟练 Handling Assignments
熟练 Instruments Drawing
熟练 Interim payment Certificate
熟练 Majoon Making
熟练 Microsoft Excel
熟练 Milestones Payment
中级 Procurement Contracts Knowledge
熟练 Project Administration
熟练 QS
熟练 Quanitity Surveying
熟练 Quantity
熟练 Quantity Survey
熟练 Quantity Surveying
熟练 Quantity Take-offs
熟练 Rate Analysis
熟练 Reporting
熟练 senior QS
熟练 Timing Skills
熟练 Variation Order VO

语言

熟练 英语