• Obtain system understanding of the auditable activity in coordination with the assistant manager and deputy manager for subsequent preparation pf risk assessment and EWP.
  • Laise with AM Audit to provide input/ suggestion for preparation of EWP, based on risk and control weaknesses identified during the systems understanding phase.
  • Prepare process flow-chart based on system understanding to identify the critical auditable activities.
  • Execute EWP through spreadsheets, audit tools and questionnaires.
  • Conduct test of controls and test of details.
  • Ensure compliance with company policies and applicable laws and regulations through use of comprehensive checklist.
  • Report the findings raised during the audit, to the assistant manager for review.
  • Maintain the audit documentation for each audit observation and audit activity performed.
  • Execute the recurring activities on regular basis, as per plan.
  • Keep abreast with internal audit best practices, methodologies and internal audit standards.
  • Maintain all the times, the confdentiality of any information obtained in the discharge of duties.
  • Coduct other audit work as directed by the CAE, in ,line with the Internal Audit plan.

工作详细内容

全部职位:
1 发布
工作时间:
早班
工作类型:
工作地址:
Port Muhammad Bin Qasim, 卡拉奇, 巴基斯坦
性别:
没有偏好
年龄:
30 - 35 年
最低学历:
学士
学位头衔:
B.com ACCA Studier, (CI/CFE will be preferred)
职位等级:
资深专业人员
经验:
2年 - 3年
在之前申请:
Oct 07, 2018
发布日期:
Sep 06, 2018

PIBT

· 101-200 员工 - 卡拉奇

PIBT has been setup as the Country’s first terminal for handling Coal, Clinker and Cement on build, operate and transfer (BOT) basis at Port Qasim Authority.

Port Qasim is located Fifty Kilometres from Karachi, on the coast line of the Arabian Sea. It has a forty five kilometer long navigation channel which provides safe and convenient navigation for vessels. Port Qasim handles more than 40% of Pakistan’s cargo.

PIBT has built capacity for handling upto 12m tons of Coal and 4 million tons of Cement & Clinker per year, which can together be further enhanced upto 20 million tons per year.

PIBT has been set up for handling and delivering coal to Power and Cement plants by utilizing the rail, road and sea networks. PIBT has become an integral part of the coal supply chain upto the entry gates of power and cement plants located across the country.

你最大的竞争优势

快速得到有竞争力的分析和专业的对你的评定
联系我们团队的专业顾问来提升你的简历
尝试罗资 专业版

相同职位头衔

Internal Audit Coordinator

Shifa International Hospital Ltd, 伊斯兰堡, 巴基斯坦
发布 Apr 19, 2024

Internal Audit Executive

机密 , 拉合尔, 巴基斯坦
发布 Apr 15, 2024

Assistant Manager Internal Audit

Samira Fabrics (Pvt) Limited, 拉合尔, 巴基斯坦
发布 Apr 17, 2024

Senior Internal Audit Analyst

Contour Software, 卡拉奇, 巴基斯坦
发布 Feb 09, 2024
浏览全部
我在ROZEE上找到工作啦!