Working in an organization having an environment feasible for learning, where I can challenge my skills and precisely recognize my managerial, intellectual and technical abilities and enhance them further.
Maintaining students previous and current record in master register
Issuance of Provisional, Surety and Passed Courses Certificates.
Process of Cases for Equivalency of Subjects.
Verification of Courses with Scheme of Studies approved by Academic Council and Board of Studies of Respective batches.
Preparation of Examination schedule/date sheet.
Setting up examination centers and making security arrangements for the center.
Arrangements for Sessional and Terminal Examination
Close monitoring the activities of Staff and Students during Terminal Exam
Printing/Photocopying of Sessional and Terminal Examination papers.
Printing of Exam entry coupons.
Uploading of Terminal Examination Marks submitted by all faculty members.
Declaration of Result Notification.
Get Degrees/Merit Certificates from Controller of Examination (Principal Seat Office) and handing over to concerned student after submission of CIIT, Dept Clearances by the student.
Process of disputed papers/Unfair Means Cases
Issuance of Result Cards
Arranging/Re totaling of Final Examination papers in consultation with the concerned teacher /Department.
Disposal of Checked Answer Sheets.
Coordinate with departments including Principal Seat regarding all matters pertaining to Examination.
As a Resident Engineer on “Multan Metro Bus” (MMBS) Project, I work as following tasks at all Metro Bus Stations of Multan regarding technical equipment and execute the routine / periodic and emergency Maintenance activities of this project:
• Installation & maintenance of OBUs in Metro Buses (Hardware, Software & Network)
• Installation & maintenance of UPS, Diesel Generators, AC, TVM, Turnstiles, PIS, PDA & Network Devices & related civil work.
• Coordination with vendors & technical team for status, task accomplishment and direction.
• Asis Portal got hands on. Stop In-Out Report, Data Sending Report, Trip Selection Report, On-line Tracking Report & Off-line Tracking Report.
• Execution & closing of Ticket & Alexxo.
• Formulated weekly activities on Bus Depot.
• Troubleshooting/Fixing of IT equipment’s.
• Maintenance of Turnstiles.
• Daily maintenance of TVM (Ticket Vending Machines i.e. Token and card dispenser machine).
• Daily maintenance of PDA.
• Configuration/Troubleshooting of Validators.
• Online monitoring of buses.
• Preparing daily mileage reports of buses.
• Focus On Customer Care
· Involved in designing, installation, testing and commissioning of Solar Water Pumps, Grid-Tie Solar,Off-Grid Solar.
· To coordinate with clients during executions to ensure satisfaction in each and every phase of Project
Execution.
·To manage and lead the project Execution team, to monitor project execution progress and performance.
·Coordination with subcontractors, engineering & Production to meet delivery schedules and timely Completion.
·Installation and commissioning of 945.4 kW / 0.95 MW PV Arrays for solarization of different Water Pumps In Government Sector
· Working as Team Lead.
· Working On Huawei Ufone and CMPAK Projects.
· Working On Huawei Ufone 3G Installation.
· MW Link 1+0, 1+1, X-PIC Installation.
· Huawei 3G Power Cube Installation, Configuration and verification at OMCR
· RTN 910, RTN 950, RTN 950A, RTN 980 Configurations.
· Conducting Line of Site Surveys.
· MW Link Up gradation.
· ATP of Microwave links (Installed at Ufone, CMPAK Network).
· Performed Dismantling Of MW Links
· BTS Swap Survey
Work on BTS of ZTE.
Perform monthly PM activity.
Perform daily CM activity.
Thanks