概要

I am a competent Project Engineer with over one (1) year of invaluable experience in successfully initiating, planning, executing and completing Coal Fired Power Project from conception to completion. I have successfully completed Three (3) internships first with Matora Digionics (PHILIPS) as an Engineering services provider, second one with Nestle as an Automation Engineer and third one in Naveena Denim (PVT)Ltd where I got an opportunity to get hand on experience in maintenance and operations. Currently I am working with Ingredion Group, USA (Known as Rafhan Maize) on the 12MW Coal Fired Power Plant under the maximum capacity of Project Instrument Engineer.
The best point in my strength is being much more confident and tolerant that enables me to develop a positive environment around me every time. I accept with pleasure the challenges and goals with good handle of the interpersonal relationships, ability to work in teams, ability to work under high pressure, so as to solve problems efficiently and achieve the goals.
Making a difference is what I am always excited about.

工作经历

公司标识
Project Electrical and Instrument Engineer
Ingredion USA, Rafhan Maize products CO Ltd
Aug 2015 - 代表 | Jaranwala, Pakistan

Ingredion Group, USA is one of the biggest FMCG company and in Pakistan it's brand name is Rafhan Maize. Which is the pioneer in producing diversified type of starches and sweeteners for multiple applications in more than 50 types of industries.Because of continuously increasing energy crisis and fuel prices Ingredion is installing 12 MW coal fired power plant.

Responsibilities
1 As a Team Player I am providing engineering and technical support services in automation, control systems integration, energy optimization and coordinating with contractor to make sure the timely delivery of equipment's, quality and control, their installation and commissioning as per standard in 12 Megawatt coal fired power plant under the capacity of Project Instrument Engineer.
2 My responsibility also includes Preparing and Freezing the Execution plan depending upon the Shipments arrival, Contractor mobilization, Work front availability, Decision making and conflict management as per site condition, managing the Cost and Time Line of the Project by making quick decisions.
3 I have also assisted my team in doing proper documentation of drawings, equipment lists and daily progress report of project.
4 As a team player I have also attended factory sutdown, overhauling of 132 KVA transformer tap changer and its oil changing.
5 As team player done the commissioning of 5 ton and 20 ton crane.
6 With my team done the lightning, grounding of the whole power plant

公司标识
Operations & Maintenance Intern
Naveena Exports Limited
Jun 2015 - Jul 2015 | Lahore, Pakistan

Naveena is a complete vertically integrated group emerged as an established World Class Yarn, Denim Fabric Denim Wear manufacturer and exporter based in Pakistan with a well-earned reputation for reliability.

Responsibilities
1 I have worked on programming of Mitsubishi PLC and it's interfacing with delta HMI along with its programming.
2 I also monitored every kind of electronics and instrument repair, their maintenance.
3 I developed a sequenced system to analyze progress work with improved efficiency of installation and repair work with great reduction in down time of machines.
4 I have also made contribution in basic circuit designing and logic development.

公司标识
Automation & Engineering Intern
Nestle Pakistan Limited
Jun 2014 - Aug 2014 | Sheikhupura, Pakistan

Nestle is a Swiss transnational food and beverage company headquartered in Vevey, Vaud, Switzerland. It is the largest food company in the world measured by revenues and ranked 72 on the Fortune Global 500 in 2014

Responsibilities
1 As a Team Player I worked on a newly installed Powder mixer machine and it's commissioning.
2 I pointed out where the flaws are or how to avoid from accidents by taking a measure of different safety steps.
3 I have also worked on a soft water recovery project and on how the percentage of recycled water can be increased, how it adds value to industry.
4 I was the part of a team doing instrument calibration. I have calibrated instruments using a software named Beamex.
5 I have also attended machine safety workshop.

公司标识
Bio-medical Engineering Service intern
Philips Electrical Industries of Pakistan
Jul 2013 - Aug 2013 | Lahore, Pakistan

Matora Digionics Pvt. Ltd. is a complete solution provider for hospital equipment needs with special focus on high-end medical diagnostics imaging systems. They are the distributors for the complete range of Philips Medical Systems in Pakistan.

Responsibilities
1 My responsibility included on site visit of a machine, make sure it's working conditions with professional engineers as team player mainly on X-Ray.
2 I trained operators to operate HMI human machine interface and to check different test points to approach fault in machine.
3 In the case of some software issue I made backup file and it's installation.

学历

Ghulam Ishaq Khan Institute of Engineering Sciences & Technology
学士, , Bachelors in Science‎
Electronics
CGPA 2.8/4
2015
Government College University
中级/A级, , FSc (Pre Engineering)‎
Applied Mathematics
所占比重 85%
2010
Govt High School Zafarwal
大学入学/0级, , Matriculation in Science‎
Science
所占比重 92%
2008

技能

中级 Conflict Reslover
中级 Decision Maker
中级 Effective Communicator
中级 Production Quality Monitoring

语言

熟练 旁遮普语
熟练 乌尔都语
熟练 英语