Jan 2018 – still working] [6MW Power Plant Installation Muzafargarh] In this experience I am working on
• Installation and Calibaration of pressure transmitters, differential pressure transmitters,vibration transducers, possition transmitters and RTDs.
• Installation of pressure switches,limit switches and float switches
• Installation and inspection of SOVs.
• Installation of PLC, Siemens Protection Relay and AVR..
• Installation of NGR Panel,VCB panel and MCC panel.
• Installation of DC Motors,AC Motors and Pumps
• QC reports ,HT line(11kVA),generator (1.2 MVA)
• Inspection,operation and control of steam Turbine and synchronous
generator.
Electrical maintenance of hydro power plant