Summary

Electrical Technologist  with 8+ years of experience working in the Electrical industry. Primarily focused on implementation of digital systems.  Enjoys being part of a team, as well as managing, motivating and training a productive team, and thrives in high pressure and challenging working environments.


Projects

Foton Jw Auto Park

Experience

Company Logo
Assistant Manager Electrical
East gate industries
Jan 2022 - Present | Lahore, Pakistan

Enter Description

Company Logo
Facility and Maintenance Supervisor
Evercare Hospital Lahore
Feb 2020 - Dec 2021 | Lahore, Pakistan

Currently have been working as \"Supervisor’’ Facility & Maintenance Engineering Department at Evercare Hospital Lahore.  • Supervised routine planned and reactive breakdown Mechanical, Instrument and Electrical work including inspections, PM\'s, over-hauls and repairs. • Inspect facilities periodically to determine problems and necessary maintenance. • Prepare weekly maintenance schedules and allocate work. • Inspect and maintain building systems (heating, ventilation etc.) • Contribute to the development of maintenance budget and ensure compliance. • Monitor inventory of materials and equipment. • Participate in coordination of projects (e.g. renovations). • Ensure adherence to quality standards and health and safety regulations. • Operation & Maintenance (Shift Handling & Trouble Shooting)

Company Logo
Electrical Assistent Team Leader
Foton JW Auto Pakr pvt
May 2018 - Oct 2019 | Lahore, Pakistan

I worked as \"Assistant Team Leader\" Maintenance and utility Department at 
FOTON JW Auto Park Pvt, Raiwind Lahore.
             Job Responsibilities:   
Responsible for the project management of all electrical Installations.   
Completed multiple tasks on time and under budget.   
Plan layout and installation of electrical wiring, equipment and fixtures, based on job 
specifications and local codes.   
Worked on chain conveyor.   
Worked on hoist crane weekly and monthly maintenance.  
JW-Forland automobile in this project I have done the installation work with chines team, while 
some of these are given below.   
Erection of Assembly line, testing line, paint plant, and weld shop.  
GI Cable tray installation (Leader type 
Electrical Power Cable laying and termination 6mm to 300mm.   
Installation/Execution of LV panels and Earthing. 
Installation/Execution of lighting and ventilation cooling system  

Company Logo
Substation Technecian
Schneider Electric Pakistan
Feb 2017 - May 2018 | Lahore, Pakistan

 I worked as ‘’Substation Technician’’ with HCMS (Schneider Electric Pakistan) 
at Emporium Mall by NISHAT Properties. 01-02-2017 to 20-05-2018  
   Job Responsibilities: 
I was dealing with client (NISHAT) as a Shift Technician from Schneider. We were taking care 
of Operation and Maintenance of all Substations.   
Schematic, As Built drawing understanding & Execution.   
Maintenance dry & oil type transformer 2500kva.  
Installation of Lights including Emergency lights according to the designed drawing.    
VCB (630A, 11KV), ACB up to 2500A (Master pact NW).     
Worked on Schneider Electric Relay’s (Micom P 122, P 341 & P 115).   
Worked on MV (RK &PIX) & LV (Blok set) Panels.   
Installation of BTD (Bus Trunking Duct) 220 to 440V.  
Installation of CT & PT of LV and MV according to the given control scheme diagram.  
LV and MV Panels including Energy Analyzer P10, TCU (Temperature Control Unit), Indication 
Lights, Selector Switch, Analog Ammeter & Voltmeter cabling according to the designed 
drawing.    
EMS & BMS system operating & maintenance.  
PFI (Power Factor Improvement) Panels.   
MCC Motor Control Centre 1.5 KW to 75KW pumps. 
Meggering of Electrical Induction Motors.   

Company Logo
Electrician Technician
Schneider electric Pakistan
Oct 2015 - Jan 2017 | Lahore, Pakistan

I worked as ‘’Technician’’ with HCMS (Schneider Electric Pakistan) in Services 
depart Lahore office.
Job Responsibilities: 
Electrical Drawing and SLD’s (Single Line Diagram).   
Installation and testing energy meter and energy analyzer.  
LV, MV Switchgear and Distribution Boards.  
RMU, Ring Main Unit.  
Cables laying, dressing, tagging and termination.  
HT / LT system and line instruments.  
VCB, ACB, MCCB, and MCB Breaker maintenance and control system.  
Testing of LT & HT, Hi-Pot Test, Earth Test, Current Injecting Test, Dielectric Test, 
Insulation Resistance Test and Continuity Test. 

Company Logo
Electrician
Khawaja Electronics Fuji capacitor
Oct 2014 - Oct 2015 | Lahore, Pakistan


Company Logo
Electrician
shahraj fabric pvt
Sep 2013 - Oct 2014 | Lahore, Pakistan


Education

National College of Business Administration & Economics (NCBA&E)
Bachelors, Bachelors in Science, ‎
Electrcal Technology
2018
Punjab Board of Technical Education Lahore
Diploma, ‎
Incomplete
2013
Lahore Board of Intermediate and Secondary Education in 1993
Matriculation/O-Level, , ‎
Science
2009

Skills

Intermediate AC Maintenance
Expert Communication Skills
Expert Computer ms office
Expert Electrical Controls
Expert Electrical Controls Designs
Expert Electrical Layouts
Expert Generators & AC Maintenance
Expert Generators Maintenance
Expert Handling Plasma Screens
Expert Hot Water Geysers Maintenance
Intermediate Instruments Drawing
Expert Kitchen Equipment Knowledge
Expert Knowledge of Electrical Systems
Expert Knowledge of Safety Equipment and Procedure
Expert Maintenance
Expert Monitoring of Vendors
Expert Power control
Expert Water Geyser Maintenance

Languages

Intermediate English
Expert Urdu