Summary


To secure a position in your company where my decisions will lead the company to ultimate success


Projects

Power theft monitoring using global system for mobile communication

Experience

Company Logo
Electrical Engineer
Eastern Spinning Mills Limited Unit-2
Jan 2016 - Jul 2020 | Lahore, Pakistan


• Erection of Gas Genset CG170-16 2*1.5MW• Supervise Deemar Engineering fabrication team• Supervise Jameel Electric Industry team• Supervise Enercon team for generator,motor,changeover Panels• Assist Allied Engineering Services team during commissioning & loadtest• Supervise electrical work in new projects at industry• Supervise assigned tasks of electrical supervisor and foremen• Designing electrical systems or their components• Train employees on use & function of electrical equipment• Perform general and recommended electrical maintenance• Maintain the record of recommended preventive maintenance• Resolve technical issues of electric machines, Cummins GeneratorsKTA50,deepsea synchronising panles DSE8610,8660,8660MKIIwithin plant and reporting to Manager• Resolve electrical problems withinstallation,maintenance,replacement of faulty equipment,monitoringof entire electrical equipment,wiring or accessories and maintain therecord accordingly• Read technical diagrams and drawings.• Inspect generators,transformers,circuit breakers and other electricalcomponents.• Preparing specifications for purchase(BOQ) of electrical equipment• Testing and modifying operational electrical machinery,control circuitand equipment• Working with a variety of technicians & Safety Equipment• Meet with other engineers to discuss new possibilities and projectsfor the company• Install new electrical equipment ensuring running efficiently• Maintain technical knowledge by attending educational workshop• Power & Control cable sizing,laying,dressing and termination• Power & Control lugs,glands and thimble sizing• Power & Control cable tray & conduicts• Electrical instruments installation Gensets,ACBs,CTs,electricmotors,Load shed circuit,jacket water and after cooler level switchesand exhaust pressure switch,J/W,A/C differential switches,PT100,airpreheating 3 way valves,J/W electric heaters,solinoid valves.• Busbar extension (Sizing & Weighing)• Solid ground earthing (Cable,Earth pits and Bore)• Installation communication cables& neutral isolation system• Installation of HT/LT panels,switchgears,starting batteries24VDC,DSE8660MKII module,mechanical instrument,PVCfills,louvers for cooling tower and generator foundation pad leveling• Ensure discipline within plant

Company Logo
Trainee Engineer
Eastern Spinning Mills Limited Unit-2
Sep 2015 - Dec 2015 | Lahore, Pakistan


Power system cost analysis
WAPDA and SNGPL bill verfication
High tension meter reading
Three phase and single phase motor winding & overhauling
Three phase & single phase control and power circuits
Star & Delta connections of induction motor
Maintain the schedule maintenance of Boge Compressors
Understanding the working of Variable frequency drive(VFDs),programmable logic controller(Siemens PLC),LT/HT panels,switch gear,power transformer and protection system
Understanding use of magnetic contactor,thermal overload relay,electronic overload relay,timer,fuse,breaker,sensors
Installation of street lights poles
Take active part in troubleshooting and maintenance jobs during shift

Education

University of Engineering & Technology
Bachelors, BSc, Bachelors in Science‎
Electric Power and Control System
2015
Faran Model School Jhang.
Intermediate/A-Level, , ‎
PRE ENGINEERING
2010
Alhamd model school jhang sadar
Matriculation/O-Level, , ‎
Science
Percentage 91%
2008

Skills

Expert Automotive Electrical System Knowledge
Expert Electrical Troubleshooting
Expert Electronics Troubleshooting
Expert Equipment Maintenance
Expert Malfunctions Identification
Intermediate Safety Management
Expert Wiring Diagrams
Beginner استخدام الخريطة

Languages

Intermediate Urdu
Intermediate English