Summary

A position among professionals, that allows me to utilize my knowledge& experience and give me opportunity to use a system approach and focus on the process redesigning for achieving quality, continuous improvement and cost effectiveness for your organization. Business optimization is key to become market competitiveness and to make speed of market.

Projects

Lean Manufacturing Facility Design
Speed To Market (STM) Project
CO2 Emission Reduction
Installation Of 550K Muffler Assembly Line

Experience

Company Logo
Section Head Planning
Interloop Limited
Jul 2017 - Present | Faisalabad, Pakistan

I am working as Section Head Operations in Hosiery manufacturing Unit.

Company Logo
Asst. Manager Production
Pakistan Spring & Engineering Co. (Pvt.) Ltd. Sheikhupura.
Dec 2012 - Jun 2017 | Sheikhupura, Pakistan

• Collect the customer order/forecast demand from Supply Chain Dept.
• Develop the Aggregate Production Plan (APP)
• Develop the Master Production Scheduling (MPS)
• Develop the Material Requirement Planning (MRP)
• Develop Capacity Requirement Planning (CRP)
• All plans are developed using Enterprise Resource Planning (ERP)
• Develop the Production plan of each job shop or cell
• Daily monitoring of production against production plan
• Removing of bottleneck process/operation by line balancing or workload balancing
• Communicate & remove the effect of issues those can disturb the master production schedule
• Communicate weekly production report to top management
• On job training and meeting regarding production & operation controls
• Definition of KPI’s for production
• Employees performance tracking against KPIs
• Ensure the documentation is being done as per standard QMS (ISO 9001:2008)
• Production downtime analysis and make CAP to remove these downtime and increase the capacity
• Kaizen the new ideas to increase the productivity and its implementation that can be through 5S, removal of 7-watse, Poke-Yoke, Value stream analysis (VSM), Basic QC tools, Line Balancing, One-Piece Flow, Quick Changeover (SMED), designing jigs/Fixtures, Layout Design, redesign the workstation,.. etc.
• Implementation of Lean Manufacturing and reduction of all inventories, so to minimize material cost.
• Ensure total coordination to QC/QA dept. against quality issues, analysis of Process rejection, customer rejection, scrap and warranty claims.
• Communicating to Maintenance Dept. in implementation of Total Productive Maintenance (TPM)
• Always in progress to Maintenance dept. about the monthly downtime analysis reduction
• Communicate to HR dept. in all stages likeRecruitment, Selection, Hiring, Training & Development, Rewards & Recognition and during resignation of employees
• Communication to supply chain dept. to ensure the selection of best supplier.

Education

Bahria University
Masters, Masters in Science, MS Project Management‎
Project Management
CGPA 3.3/4
2018
University of the Punjab
Bachelors, Bachelors in Engineering, (B.Sc.) Industrial Engineering & Management‎
Engineering Management, Industrial Manufacturing, Production and Operations Management
CGPA 3.1/4
2012

Skills

Expert Capacity Planning
Expert Demand Supply Planning
Expert Engineering & Manufacturing
Expert Inventory Forecasting
Expert Inventory Optimization
Expert Inventory Planning
Expert Kaizen
Expert Labour Management
Expert Lean Manufacturing
Expert Operation Management
Expert Pre Production Planning
Expert Production Coordination
Expert Production Management
Expert Production Planning
Intermediate Quick Changeover (SMED)
Expert Warehouse Management
Expert Warranty Quality Assurance Process
Expert Work Study and Methods Engineering

Languages

Expert Urdu
Intermediate English