Summary

B.Sc. Electrical Engineering in 2012.
M.S in Project Management in 2017.

12 years of professional experience in Hydro and Solar Power Plants.

Currently, working as a Country Head - Techno Commercial to lead design department, operations department and procurement department.

Projects

Swabi Textile Mill 5MWp
1.25MWp
FFC 2MWp Solar On Grid Project
4MW Shabir Tiles Karachi
Hydro power plants

Experience

Company Logo
Country Head - Techno Commercial
Hadron Solar (Pvt.)Ltd
Jun 2023 - Present | Islamabad, Pakistan

Responsible for overall Project Management, PPA Agreements, Cost Management, Time Management, Reporting and Meetings with Stakeholders.
Projects: (PPA and C&I Solar Projects)
C & I Solar Projects: 100kWp to 10 MWp.
PPA Solar Projects: 300kWp to 10 MWp.

Company Logo
Head of Projects and Operations
Zonergy Corporations
Aug 2021 - Jun 2023 | Islamabad, Pakistan

Responsible for overall Project Management, execution, designing, procurement, cost Management, Time Management, Reporting and Meetings with Clients and Vendors.
Projects: (EPC and Tender & Bidding Solar Projects).
1). 4.0 MWp Solar Power Plant at Shabir Tiles. Plant Capacity: 4.0 MWp - On grid Hybrid system.
2). 1.25 MWp Solar Power Plant at GIKI University Swabi. Plant Capacity: 1.25 MWp - ON Grid Hybrid system.
3). 2 MWp FFC Rahim Yaar Khan. Plant Capacity: 2.0 MWp - ON Grid System.
4). 100 MI Residential Houses. Plant Capacity: 540 kWp - ON Grid System.
5). 200kWp Air University Islamabad. Plant Capacity: 200 kWp - ON Grid Systems

Company Logo
Manager (Design and Operations)
Barg Engineering Consultants
Mar 2018 - Jul 2021 | Peshawar, Pakistan

Responsible for overall Project Management, Operations, designing, Reporting and Meetings with Clients and Vendors.
Projects: (Pakistan Government Solar Projects)
1). Solar Mini Grids in Merged Areas of KPK Pakistan Plant Capacity: 2.60 MWp Off-Grid Hybrid system.
2). 6 District Head Quarter Hospitals in Merged Areas of KPK Pakistan Plant Capacity: 500 kWp off Grid Hybrid system.
3). 10 Basic Health Units and RHCs in KPK Pakistan Plant Capacity: 600 kWp off Grid Hybrid system (50kWp each).
4). Solar Pumping System of (2 HP to 50 HP) in KPK Pakistan. Plant Capacity: (2 HP to 50 HP).
5). Active Solar Tracking Systems (1P and 2P) in KPK Pakistan. Plant Capacity: (40KW to 300KW).

Company Logo
Electrical Field Engineer
Sarhad Rural Support Programme (SRSP)
Aug 2014 - Mar 2018 | Swat, Pakistan

• Survey, Site Identification & Data Collection.
• Feasibility Reports.
• Selection of Turbine Generator Sets and other Electro-Mechanical Equipments.
• Design and Cost Estimation of Micro, Mini & Small Hydro Power Projects.
• Installation of Turbine Generator Sets and other Electro-Mechanical Equipments.
• Transmission and Distribution.
• Testing & Commissioning.
• Operation and Maintenance of Plant.
• Responsible of billing system of Community.
• Operators Training.
• Correspondence with vendors and suppliers.
• Supervision of Logistics.
• Coordination with Village Organization and SRSP.

Company Logo
Junior Electrical Site Engineer
DONG FANG ELECTRIC CORPORATION
Jan 2013 - Jun 2014 | Battagram, Pakistan

• Supervision and monitoring of erection/installation, testing and commissioning of all Electrical & Mechanical equipments.
• Check /inspect the consignment, materials, parts, and equipments prior to installation.
• Supervision of all electrical work in pressure channel, diversion tunnel & power house.
• Overview drawings as per site requirements.
• Prepare daily, weekly and monthly progress reports of all activities.

Company Logo
Traine Engineer
National Transmission and Dispatch Componay
Jul 2013 - Dec 2013 | Peshawar, Pakistan

• At 500KV grid station i have worked with operation and maintenance staff to learn about grid Equipments and attended power transformer testing, general Structure of Grid Station.
• Current Transformer Potential Transformer, Circuit Breaker and Lightening Arrestor.
• Three Phase Power Transformer and Capacitor Bank.
• Differential, Distance, Over Current and Over Voltage Relay.

Education

Abasyn University Peshawar
M-Phill, Master Of Science in Project Management‎
Project Management
Completed
2017
CECOS University of Information Technology and Emerging Sciences
Bachelors, Bachelors in Science, Bachelor of Science in Electrical Engineering‎
Electrical Power
CGPA 2.8/4
2012
Govt. Degree College
Intermediate/A-Level, Faculty of Science (Pre-Engineering), F.Sc Pre-Engineering‎
Mathematical Physics, Chemistry, Mathematics
Percentage 64%
2008
University Public School Peshawar
Matriculation/O-Level, Matric in Science, Matric in Science‎
Physics, Mathematics, Chemistry
Percentage 71%
2006

Skills

Expert Inspections Implementation
Expert Special Effects
Beginner Surge Protection
Expert Technical Engineering
Expert Tender Preparation
Intermediate Transformers
Expert Troubleshoot Solar Installation
Expert Troubleshooting Skills
Expert Understanding Of Diagrams
Expert Work under presuure
Expert Xray Equipment Maintenance
Expert المهارات الهاتفية

Languages

Expert Pashto
Expert Urdu
Expert English