Respected Sir; I have an experience of working as MEP Engineer in the industry and construction sector for over 11 years. Moreover, working on Infrastructure projects.
Currently, working as MEP Engineer at Bahria Icon Tower (62 Floors Office Tower+10 Floor Retail+42 Floor Apartment Tower with common 07 Basement Floors)
Recently, I was working with PARSONs Saudi Arabia for Royal Commission.
Previously, I worked with SAUDCONSULT, Riyadh. Major projects include HVAC Design of Majmaa Hospital (400 Bed) and University Hospital Bahrain (400 Bed).
Also, I worked with Al Jazirah Engineers & Consultants with Royal Commission (RC). Major projects include Hydraulic Modelling of Chilled Water Systems for RC University Women's Campus and MENs' Campus using PIPENet Software and HVAC design of Health Center.
I worked in UAE as Mechanical Engineer (HVAC)/Plumbing Engineer on HIGH RISE PROJECT (B+G+4P+Pooldeck+29) Al-Reem Island, comprising of 06 towers. SHALL APPRECIATE YOUR RESPONSE. Thanks & Regards, Farman Faisal (Mechanical Engineer) 00923175831693 00923339172570
Design Supervision & Installation of MEP Systems of Bahria Icon Tower (62 Floors Office Tower+10 Floor Retail+42 Floor Apartment Tower with common 07 Basement Floors)
Major Systems Covered;
8800 TR Chilled Water System (Primary & Secondary Pumping-VFD Driven) with Condensing water circuit comprising 04 nos. Cooling Towers (each 6000 gpm) and 05 nos. Condenser water Pumps-VFD Driven.
HVAC Air-side System comprising of AHUs (upto 5 TR) & FCUs (upto 3 TR) on Floor levels including FAHU.
24 MW 11 KV Karachi Electric Power Supply System with 100% Back-up Gensets on common Busbar interfaced with SCADA
Parking Ventilation & Smoke Extract System for 07 Basement Floors looped with Fire Alarm Control Panels
20.5m3/hr Booster Pumps (03 nos.) with Expansion Tank for Retail Area and 64m3/h3 Water Transfer Pump Sets for Office Tower & Apartment Tower serving up to 20 floors.
Fire Fighting System comprising of FHCs & Sprinklers on each floor (Basements Parking, Retail Area, Offices, Apartments) through separate risers. System is fed by 1500 gpm capacity Fire Pump Set serving upto 17 floors.
BMS System supported by BACNet MSTP/IP Protocol with Network Interface Unit on each floor having Fibre Optic Backbone; Schneider Controllers are used for Field Equipment & looped through Belden Cable as Master-Slave.
Installation Supervision & Commissioning of 29.6m3/hr R.O Plant achieving TDS of 380 ppm from 35000 ppm Borehole Water for Cooling Tower M/up water & 50 ppm for Drinking water quality.