Assistant manager engineering at Mayfair Group Of Companies from 1st Jun 2013 to 30th July 2014.
Working as Electrical Engineer and Project Coordinator for Installation of Confectionary Plant at Mayfair Group Of Companies Limited.
To Ensure Reliable Operation Of Plant Machinery By Performing Corrective Actions In The Electrical Power And Control Equipment.
Installation Of Latest Technology Automation In Machinery.
Troubleshooting on PLC.
Worked As TPM Coordinator And Implementing 5S In Place That Is On The Base Of TPM
Worked For SAP To Re-Struct The Plant Machinery For Correct Maintenance
Worked In Different Modules Of SAP
Planning Of Activities Of The Project By Using MS Project And Follow Up For The Completion Of Projects.
To Ensure The General Safety During Installation Of Project.
3 years experience as Project Engineer in Cotton Craft Pvt Ltd. From 2010 to 2013
TPM ( Total Productive Maintenance) Training At Asian Food Industries Ltd
Training Of 5S Implement And General Safety
Training Of SAP ( System Application Products)
One Month Internship In Nishat Group
4 times Shut down at Dawood Hercules (Pvt) Ltd.
Serving as operation and maintenance engineer.
Job responsibilities
Installation the project within given time frame.
Testing and commissioning the project equipment and and during installation at site. Dsigning of LV panels.
Designing of cable laying route of AC and DC . Maintenance the equipment at site .