More than 11 years working experience in different multinational companies like BL Herbert International, Paragon Constructors Pvt Ltd and Redco International. Looking to secure a position in an Engineering Department, where I can bring immediate and strategic value and develop current skill set further. I m the willing to perform different and unique task in my life. so Looking Forward for the next task....!!
1. Excavation for Cables for Underground Wiring
2. Cable Laying for whole town HT and LT.
3. Installation and Commissioning of Transformer, LBS and Distribution Boxes of Whole Town.
4. Designing of HT and LT Lines + House Wiring as per standard on AutoCAD in 2D and 3D.
5. Installation and Wiring of PV Panels, Frames of PV Panels, Batteries and Solar Inverters in the Whole Town at Different Areas (Include Tube Well, Mosques, Houses, Offices and Other Commercial Areas).
6. Repairing and Maintenance of All type of office hold equipment installed in the Office.
7. Repair, Maintenance and Installation of All Street Lights installed in the Town.
8. Managing the Timing of Water Supply for town and maintain the log book of Water Supply for Maintenance at time.
Details:
• Green Line Qatar Rail Project (Hamad Hospital Station – Al Saad, Doha, Qatar), (Qatar National Library Station – Doha, Qatar), (Al Shaqab Station – Doha, Qatar), (White Palace – Doha, Qatar), (Education City – Doha, Qatar).
Keys and Responsibilities are:
• Closing the Snags
• Making IRN for the Testing and Commissioning of the all the equipment’s
• Making the Construction Scenario Report (CSR)
• IR’s of the all following mentioned Systems
• Installation of Electrical Lighting. (Normal, Emergency)
• Fire Alarm System
• Fire Separator System (ASD)
• Fire Suppression System (FM-200)
• Installation and termination of Control Panels of FCU’s AHU, DB, SMDB, MCC’s as per drawing.
• Furthermore, Having Knowledge of using Largest Document Controlling Software Aconex
Details: Pakistan’s Largest Telenor Head Office Construction in Gulberg Green, Islamabad worth of 70 Million US Dollar.
Keys and Responsibilities are:
• Charge of site engineer for temporary work in which all kind of providing temporary lighting at site.
• Maintaining all required documents including daily resource deployment report along with drawings, record keeping of subject department.
• Smooth execution of Monthly Targets in Coordination with Sub Contractor “Power Professional & Engineers (Elect.) & Season Master (Mech.)” along with other execution related tasks that arise on daily basis.
• Supply installation and commissioning of all HVAC Item and Pumps, Electrical Lights, PV Panels and BTD, Plumbing Lines and Pumps, Irrigation Sprinkle and Drip, Water Treatment Plant, Sewerage Treatment Plant, Kitchen and IT Equipment’s as per BOQ, Tender Drawing, IFC Drawing and after all As–Built drawing for submission.
• Furthermore, working on Handover documents in which coordination with vendors for catalogues, user manuals and spares parts list for trouble shooting and maintenance is involved.
• Cross check of Purchase Orders (PO) and Delivery Challan (DC), Material Request Number (MRN) and Raised Request for Information (RFI) is also a part of my job description.
Details:
• Microsoft Nokia Lumia Project (OYE) In Islamabad and Rawalpindi twin city
Keys and Responsibilities are:
• Making daily progress report.
• Provide after sales services to the client regarding software activation and hardware trouble shooting of the smartphones.
• Number of person under the supervision of mine are 15 Sales representatives.
Details:
• Jamia Mosque Noori Project (Installation Planning and Commissioning of 3 Phase Wiring) 4 Story Building
• Omer Sweet Shop (Installation Planning and Commissioning of HVAC Work and Lighting work) 3 Story Building.
Keys and Responsibilities are:
• Making daily progress report.
• Take a work from supervisors which are assigned from contractor and complete a work in the given time.
• Number of person under the supervision of mine are 3 Electricians and 4 Helpers.
Details: United State Embassy Warehouse Old 7up Factory, Sector I9, Industrial Area Islamabad Pakistan
Scope of Work: Misc. Civil Works
Main Contractor: B.L. HARBERT International
Contract Value: Approx. USD 1 million
Keys and Responsibilities are:
• Installation of PVC Conduit and cabling of all kind of wiring (single Phase and 3 Phase) of American Embassy Warehouse build in Islamabad Pakistan.
• Taking task from Electrical Supervisor and work as per shop drawings.