خلاصہ

At Clinker Silo Discharge
Erection of new Cement line 7700 TPD of power Cement pvt ltd Noriabad with FLSmidth Denmark.
Key Areas to be Responsible for
Pre Assembly and Erection of Bag filters.
Erection of Belt conveyors,Drag chain conveyor,Silo discharge units,Piping of compress air reciever,Screw conveyor.
Do regular inspection during installation with Clients.

تجربہ

کمپنی کا لوگو
Site Engineer
Tianjin Electric power construction
دسمبر ۲۰۱۸ - اکتوبر ۲۰۱۹ | Jamshoro, Pakistan

i worked in Power cement ltd Noriabad with contractor Tianjin Electric power construction at Clinker Silo.
Erection of new Cement line 7700 TPD of power Cement pvt ltd Noriabad with FLSmidth Denmark.
Key Areas to be Responsible for
Pre Assembly and Erection of Bag filters.
Erection of Belt conveyors,Drag chain conveyor,Silo discharge units,Piping of compress air reciever,Screw conveyor.
Do regular inspection during installation with Clients.

کمپنی کا لوگو
Internship
Wapda Thermal Power Plant GENCO 2
اگست ۲۰۱۷ - اکتوبر ۲۰۱۷ | Guddu, Pakistan

I had learn about Gas turbine and Steam turbine.
I also had a internship in HVAC Water chiller system

تعلیم

khawaja fareed university of engineering and information technology Rahim Yar Khan
بیچلرز, , B's mechanical engineering‎
Thermodynamics, refrigeration, manufacturing, powerplant, Engineering drawing
CGPA 2.6/4
2018

پیشہ ورانہ مہارتیں

ایک سال سے کمCompiler Construction
ایک سال سے کمDecision Making
1 yearEngineering
ایک سال سے کمMicrosoft Office
ایک سال سے کمTeam Management Skills

زبانیں

متوسط انگریزی