خلاصہ

An energetic and team building Industry Leader with a can-do approach and having a 4 years profound experience process improvement, machine maintenance activities, Health Safety & Environment (HSE) & Water utilities operations (ETP/RO/Pumping systems).

پراجیکٹس

Recycling of ETP Treated water through RO Plant Facility (2.5 M)
RO Plant Facility - 20,000 GPD ( 2 M)
Effluent Treatment Plant Facility - 50,000 Liters/day (55.4 M)
Revival of Effluent Treatment Plant Facility - 80,000 Liter/day ( 3.8 M)

تجربہ

کمپنی کا لوگو
Assistant Manager - Production Engineering
Al-Ghazi Tractors Limited (Al-Futtaim)
جنوری ۲۰۲۲ - موجودہ | Dera Ghazi Khan, Pakistan


Plant capacity assessment by Time & Motion studies
Development of all plantʼs processes controlled documents (control plans)
Develop WIS of all manufacturing process
Re-layouting of plantʼs assembly lines to remove MUDA activities.
Productivity enhancement of Tractor Assembly, Engine Assembly & Transmission line by removing non-value added activities.
Technical Assessment and Procurement of Equipmentʼs.
Manage operation & maintenance of Effluent Treatment Plant (ETP), RO Plant, Chillers & Cooling Towers. Develop HSE Procedures

کمپنی کا لوگو
Assistant Manager - Production & Plant Engineering
Agriauto Industries Limited (House of Habib)
مئی ۲۰۱۷ - دسمبر ۲۰۲۱ | Hub, Pakistan


Manage operation & maintenance of Effluent Treatment Plant (ETP), RO Plant, Chillers & Cooling Towers.
Operation and Maintenance of different types of pumps and piping network.
Create, maintain, and develop standards for plant operating documentation(e.g. standard operating procedures, process descriptions, material and energy balances, P&IDs, operating data collection and retrieval)
Conduct Root Cause analysis of breakdowns
Management of back-up spares
Manage control of contractors in areas of ownership
Preparing & monitoring of CAPEX & OPEX.
Time & Motion study of assembly line Develop detailed cost estimates and project schedules
Prepare project proposals and plans to develop project objectives
Manage Contractors working on the project
Planning/budgeting & Commissioning of wastewater treatment plant (ETP) project under the supervision of Sr.Mgr
Conduct internal/external audits of ISO 14001 & ISO 45001 

تعلیم

NED University of Engineering & Technology
بیچلرز, , ‎
Metallurgical Engineering
CGPA 2.7/4
2016
Adamjee Govt Science College
انٹرمیڈیٹ / اے لیول, فیکلٹی آف سائنس (پری انجینئرنگ), ‎
Physics, Chemistry , Mathematics
درجہ A
2012
Usman Public School (Campus-II)
میٹرک / او لیول, سائنس, ‎
Computer Science
درجہ A+
2010

پیشہ ورانہ مہارتیں

ماہر A3 Reporting
متوسط Cooordination Skills
متوسط Export Consignments
متوسط Implementation Of HSE Plans
متوسط Instruments Drawing
ماہر Lean Manufacturing Techniques -5S/KAIZEN
متوسط MS Projects
ماہر MS Visio

زبانیں

ماہر اردو
ماہر انگریزی