خلاصہ

A team player with excellent communication skills and academic qualifications, possessing a comprehensive knowledge of Power Plants, Renewable Energy Systems and developing projects for Power Generation by focusing on economy, safety, reliability, quality and sustainability.I am flexible, reliable and possess excellent time keeping skills. I am an enthusiastic, self-motivated, reliable, responsible and hard working person. I am a mature team worker and adaptable to all challenging situations. I am able to work well both in a team environment as well as using own initiative.
Easy going by nature and able to get along with both work colleagues and senior managers, currently looking for better opportunity to enhance my capabilities with the Assistant Mechanical Engineer position


پراجیکٹس

Design and Fabrication of Pin on Disc fluctuating Mechanism apparatus for t

تجربہ

کمپنی کا لوگو
MECHANICAL ENGINEER TRAINEE (ROTATING MAINTENANACE TECH)
BRUNEL QATRA
فروری ۲۰۲۰ - مارچ ۲۰۲۰ | Al Wakrah, Qatar

                 Mechanical Rotating Technician (2nd Feb 2020 to 16th March 2020 )
                 Brunel oil and gas services W.L.L Company Qatar.
 It is approximated 2 month turnover at LLDPE Plant of the Qatar petrochemical company (QAPCO).Performed the Shutdown with Brunel company in Qatar Petrochemical company (QAPCO).performed the following tasks.
o   Overhauling of the twin screw extruder with barrels and Palletiser of German Coperion Company.
o   Study of the technical assembly and dismantling drawings and P&I of operations sequence of the plant.
o   Study of the commissioning and installation drawing of the plant accessories and axillaries system.
o   Performed the all shutdown activities hand on experience by using different tools and techniques.

کمپنی کا لوگو
Mechanical Engineer trainee
Uch private limited
مئی ۲۰۲۱ - دسمبر ۲۰۱۹

کمپنی کا لوگو
Mechanical Engineer trainee
Uch private limited
مئی ۲۰۲۱ - دسمبر ۲۰۱۹

کمپنی کا لوگو
Mechanical Engineer trainee
Uch Power (Pvt.) Ltd.
دسمبر ۲۰۱۸ - دسمبر ۲۰۱۹ | Naseerabad, Pakistan

It was one year training program; started from the Operations Dept. It was three months orientation, where I was offered to learn the basics of Combined cycle Power Plant, BOP systems, Gas Turbine, Heat Recovery, and Steam Turbine Systems. The learning perspective of systems was based on: Purpose of system, Process Flow (P&ID), Equipment used, Detailed Description, Factors effecting on the system, and Limitations of systems. After three months orientation of Operations Dept., switched to the Mechanical Maintenance Dept. Started from the learning of safety protocols, safety procedures, use for the performing different maintenance activities at plant. I have been engaged on daily basis activities (CM & PM), starting from the generating a job request, placing the work orders, generating the work risk assessment reports, till the execution of the work activity, and cancellation of work permit. Beside of that, soft skills are also being considered to improve, such as technical report writing, Maximo operation, and excel work sheet, my technical knowledge, hands on experience upon mechanical activities are as fallow:
o   Routine base PMs and CMs on gas turbine, steam turbine and HRSG.
o   Shaft alignment methods
o   Bearing clearances measurements
o   Backlash of gearing mechanism
o   Overhauling and troubleshooting of pumps (Centrifugal and   Reciprocating)
o   Troubleshooting of compressor (Rotary)
o   Maintenance of valves, filters and heat exchanger
o   Maintenance of Demineralized water Trains and Clarifiers
Performed Major Inspection (Three Shutdown) of Gas turbine Frame 9E. (10 Oct 2019 to 20 Nov 2019).
o   Inspection (NDT) and  maintenance of  HRSG (HP ,IP LP Drums)
o   Inspection and maintenance  of valves ( globe valve, gate valve , none returns valve ,ball valve, butter fly valve, MCV  and diaphragm valve)
o   Inspection and maintenance cooling tower
o   Inspection and maintenance of cooling tower gear box
o   Check Cooling tower fan angle and track as well. 
o   Performed shaft alignment by using Rim and Face method and check shaft Run out.
Monitor and inspect the Rigging with crane (SWL) of capacity (360, 200, 100, 50 ton) lifted the weight 5 to 35 ton.

تعلیم

University of engineering and technology taxila (UET Taxila)
بیچلرز, بیچلرز ان سائنس, ‎
Mechanical Engineering
CGPA 3.3/4
2018
انٹرمیڈیٹ / اے لیول, , Fsc pre engineering‎
Fsc
فی صد 61%%
2014
میٹرک / او لیول, , Science‎
Science
فی صد 83%%
2012
میٹرک / او لیول, , Science‎
Science
فی صد 83%%
2012

پیشہ ورانہ مہارتیں

متوسط Analytical Skills
متوسط AutoCad Mechanical
متوسط Bidding
متوسط Complex Engineering
متوسط Designing
متوسط Electro-Mechanical Troubleshooting
ابتدائی HVAC Maintainable
متوسط Mechanical Assembly
متوسط Mechanical Drawings
متوسط Mechanical Engineering
متوسط Mechanical Estimation
متوسط Mechanical Handlingv
متوسط Mechanical Quantity Surveying
متوسط Mechanical Work
متوسط Micrsosft Excel
متوسط Problem Solving
متوسط Proposals
ابتدائی Systems evaluation ,System Inspection ,
متوسط Technical Skills
ابتدائی V Engineering
ماہر Written Oral and Communication

زبانیں

ماہر پنجابی
ماہر انگریزی