Responsibilities
Manage and organize project documentation, including pictures and reports, ensuring accurate and timely records for all solar projects.
Utilize Paperclip and Odoo software to streamline administrative processes and enhance operational efficiency.
Develop and maintain Excel spreadsheets to track project progress, resource allocation, and deadlines.
Prepare comprehensive project case studies to support performance evaluation.
ResponsibilitiesInstallation and Commissioning of 6.6 MW UtilityScale Grid Tied Solar Project.
Led the planning and execution of the installation process, ensuring compliance with industry standards and safety protocols.
Coordinated closely with the project team, vendors, and external stakeholders to meet installation and commissioning deadlines.
Successfully achieved the operational readiness of the 6.6 MW Solar Project within the stipulated time frame, contributing to the organization's commitment to sustainable energy solutions.
Project Coordination and Team Management
Played a key role in project coordination, overseeing all aspects of the solar project.
Collaborated with cross-functional teams, including Electrical Engineers, Maintenance Staff, and External Contractors, fostering a collaborative and productive work environment.
Online Monitoring of Solar PlantImplemented an online monitoring system, enabling real-time tracking and analysis of the solar plant's performance using SCADA.
Supervision of Housekeeping Labor
Managed and supervised a team of housekeeping laborers, ensuring the scheduled cleaning of 12,000 solar panels.
Implemented efficient schedules, contributing to the optimal functioning of the solar panels and maintaining peak efficiency.
Technical Expertise
Applied technical expertise in single and three-phase connections, AC & DC wiring, and troubleshooting electrical systems.
Collaborated with maintenance teams to ensure the ongoing operational integrity of the solar-powered plant.
My tenure as a Solar Project Site Engineer at YunusTextile Mill not only strengthened my technical skills but also enhanced my leadership and project coordination capabilities.
Responsibilities
Ensure smooth and continuous functioning of the Power Plant.
Responsible for Data Logging all the parameters of engines Besides that I had to take a round of the Engine hall and look for all the auxiliary plant equipment like Pumps. Monitored operations and reported on issues for quick troubleshooting.
Checked Engine oil level, took samples of lube oil and coolants, and refilled oil into the oil sump of engines.
Checked Cooling Tower water level, Overhead Water Tank level, and radiators functioning.
Switched on and off engines as per the required activity.
Kept plant areas clean and ready for inspections to maintain high audit scores.