A passionate researcher and a humble resource person with consistent efforts towards career growth, continuous improvements, and challenging opportunities. He is Results-oriented Civil Engineer, with over 4 years of professional hands-on experience, highly skilled at structural design, site management, monitoring, and cost estimation. Strong track record of delivering projects under the domain of triple constraints with quality deliverables on time, within budget, and to the quality standards. Dedicated to expanding knowledge and building on fundamental skills with continual improvements. To explore the innovations in the field of Civil Engineering, new technologies, and new applications are consistently adopted for the sake of learning and professional growth by joining a dynamic team in a well-known Humanitarian Organization and Construction company as an Engineer. I am looking forward to having a challenging opportunity in an environment where I can utilize my technical & professional skills, and capacities to the best of my efforts in a conducive learning environment.
· Assist in analysis of construction material e.g. elemental composition, dimensions & quality etc. according to drawing & specification.
· Assist in conducting market survey for proposed materials availability, unit rates of material/labors and provide realistic estimates of the proposed activities of DRR and infrastructure activities project
· checking technical designs and drawings for accuracy and to ensure that they are followed correctly
· Hands on experience in DRR and infrastructure activities services restorations in flood situations
· Review of project documents (construction drawings & specifications) as well as business process / DIP in detail for understanding project mandate / deliverables relevant to your role.
· Carry out the technical feasibility / assessment (site identification, material, labor, transportation, supplies etc) of DRR and infrastructure activities prior to implementation for ensuring sustainability & cost effectiveness as well as agreed time frame of project.
· Assist in preparation of drawings, BoQs & cost estimates of infrastructure schemes as per IR commitment & set standards (provide an example i.e. SPHERE, EQ resistant structure etc).
· To be able to get different materials sampling, on different intervals, for testing and quality check & work assurance with approved samples during the course of implementation at the field
· Take part in supplier selection process by evaluating the samples against specifications given in approved BOQs/estimates at field level as & when needed.
· Ensure the layouts, levels and all activities at site both pre & post construction to know whether construction work is being done according to drawings and specifications or not.
· Analyze and prepare plans for material requisitions.
· Monitor and provide support for developing understanding of skilled labours, community activists or beneficiary household regarding design, inclusiveness, DRR and protection measures.
· Timely report to supervisor regarding any issue relevant to design at earliest stage of the project with recommendations
· Planning and Estimations - BOQ’s, DIP/Layout Plan, Cash Flow, Technical drawings, side management, implementation, electric and mechanical work, monitoring etc.
· Quality Control, Site Inspection & Site Management.
· Tracking and Monitoring the Plans, Drawings & Quantities for Accuracy of calculations.
· Assurance the quality of material, use of material and overall work progress.
· Responsible in Evaluating and Assessing Progress Reports to Project Manager and Consultants regarding the Progress of Construction Activities Upon Baseline.
· Planning and designing for infrastructure including the protection walls, dykes, retaining walls, foundations, latrines construction, shelter designing and construction.
· Development of progress reports in light of BOQs i.e. construction drawings & specifications as well as business process /DIP.
· Carry out the technical feasibility / assessment (site identification, material, labor, transportation, supplies etc) of disaster risk reduction and infrastructure related activities
· Been proactively engaged in preparation of drawings, BoQs & cost estimates of infrastructure schemes in line with the quality standards.
· Conducting the market survey for proposed materials availability, unit rates of material/labours
and provide realistic estimates of the proposed activities as per work plan
· Assessing the supplier selection process by evaluating the samples against specifications given in approved BOQs/estimates at field level as & when needed.
· Ensure the layouts, levels and all activities at site both pre & post construction to know whether construction work is being done according to drawings and specifications or not.
· Monitor and provide support for developing understanding of skilled labours, community activists or beneficiary household regarding design, inclusiveness, DRR and protection measures.
· Timely report to supervisor regarding any issue relevant to design at earliest stage of the project with recommendations
· I Worked with Zac Engineer & Consultancy for almost on cost estimation of project, Design of multi-storey buildings and structure drawing detailing, Architecture drawing and detailing under Dr. Zeeshan Allam. I have full command on drafting and also calculate quantity of materials by using excel. I can also use Rivet for architectural drawing. Completed accurate engineering calculations for weights, loads and other metrics using both manual and digital method.
· Design of reinforced concrete structures [Residential Buildings] and sub-structural design [Foundation].Researched zoning laws and building codes to verify conformance with regulatory agencies. Drafted structural plans using computer aided design software.
· Travelled to construction sites to collaborate with construction personnel and to confirm compliance with design parameters and regulations.
· Preparation of weekly/monthly work plans by ensuring timely completion of assigned tasks in the stipulated time period.
· Coordination with potential stakeholders and especially community activists, COs, VOs, and beneficiary households for smooth implementation of the project
· Development of a contingency plan to deal with external factors affecting or may affect the field activities
· Supervising and managing the skilled and unskilled labor for construction execution
· Maintenance of record (hard & soft) that includes but is not limited to Cost estimates, BoQs, drawings, construction plans, Measurement book, daily field visit reports, material requisition, pictorial progress & other documentation.
· s.