Project Engineer REON Energy 3 feb 2020 continue.
Deputy Manager in Gul Ahmed Textile Mills Karachi in Engineering Department.
• Worked as a project Engineer I am responsible Design , installation , initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time.
• Managed system enhancements by troubleshooting & maintaining Electrical Power Distribution Switch gears.
• Project Works related to Electrical Lower Voltage Distribution And Trouble shooting.
• Troubleshooting different fault related to electrical/electronic in Solar PV System and also working in a electronics lab on different electronic devices such as DC drives, controller cards , power supply , circuits etc.
• Engage with the operation team of power house to rectify different faults, Also maintain daily maintenance report of all the machines.
• Ensure compliance with company policies and quality standards in project execution.
• Development of Project Feasibility documents ( Technical , Financial And Tender submission documents.
• Development of Plan of action documents for executing Large Scale Solar PV Projects as per timelines ( Inception of Project to Testing and Commissioning ).
• Design, Install, execution , Operate and maintain all types of Solar PV Systems (On-grid/Off grid/Hybrid system on large scale 4.5 MW.
• Supervise development of detailed drawing sets and as built drawings .
• Conduct timely site inspections to review progress and conformation of rules and regulations.
• Attend sales meetings to clarify technical queries from client side.
• To Prepares quality inspections and testing plan checklist of all electrical and mechanical work and Supervise and Monitor all the electrical commissioning / installation activities.
Responsibilities
• To Manage Cost of Electrical or Electronics Equipments and Monthly Report of Finance Department.
• Managing and Monitoring the Performance of Employees.
• Designed and implemented Electronic circuit hardware of Professional 9100 & Professional 9200.
• Supervise Electrical Instrumentation maintenance by team members and analysis for cost effective and eminence production of Plant.
• PLC troubleshooting and amendments in PLC logic and HMI Controls.
• Testing of all electronic circuits for accurate and efficient functionality.
• Installed and commissioned LT Switchgear and PLC of Professional 9200 machines, Warping Tsudokoma and Ukil Section Warping.
• Maintenance and repairing of Electronic Cards, to avoid breakdowns and submit daily stopage cards report.
• Calibration of different valves PT 100, Solonoid proportional valves and field instruments.
• Maintenance and programming of Siemens Inverters & Servo drives.
• Installation and maintain backup of each PLC and HMI.
• Controlling and automation of PLC of Sizing, Section Warping and Bennigner Machines.
• Installation of WBS motors and Servo motors of Professional 9100, & Professional 9200.
• Troubleshooting of Professional 9100, Professional 9200, Sizing, Warping (tsudokoma).
intrenship