To envisage a career in a well-established and competitive organization where I can nFully utilize my skills.n Seeking for a position of electrical engineer/supervisor and want to work with a progressive and forward thinking company where I can use my skills.n Desire a professional position using team work, engineering knowledge, computer skills, and creative thinking to solve problems regarding control system and Automation
Supervision of package 8B.
Makes daily inspections of electrical installations of Data Underground Medium and Low Voltage Power cables, HT and LT Panels, MV/LV Transformers, Distribution Boards (DBs), MCC Distribution Panels, DCS Panels, Diesel Generators and Uninterrupted Power Supply (UPS) Systems, Battery Banking and other equipment associated with Power Sub Station.
Maintain the accurate records of inspections and installations; communicates with contractors, architects to ensure electrical compliance of specification.
Analyzing information and evaluating results to choose the best solution and solve problems at site regarding electrical works.
Performs the material inspections of electrical items, conducts tests and issues approval or correction notices as per approval.
Inspect and monitor construction sites regarding electrical works to ensure adherence to safety standards, building codes, or specifications.
Operation and Maintenance of Substation equipments including, issuing safety work permits, troubleshooting, condition monitoring etc.
Maintenance of power transformers (33/11kV) medium voltage transformer (11/6.6kV) low voltage transformer (6.6kV/415V), Circuit breakers (SF6, Vacuum), CTs, PTs, Battery, Battery Chargers etc.
Operation and Maintenance of control and Relay panels, LV panel, DB etc.
Maintaining various records such as monthly operating reviews, daily log sheets, different registers etc.
Supervising all ongoing works at yard and line.
Power Plants & Sub Station Experience:
Installation of two 230 KV Line Protections at Berri S/S Khurasaniyyah S/S, Rawadah S/S & South Hofuf S/S.
Meager Testing, Continuity Testing & Insulation Resistance Testing.
Replacement of CT’s.
Working on 33KV & 66KV Main Breakers.
Cable Routing, Testing of Breakers in Power Plants.
Working in 380/230, 230/115, 115/66 KV
Dismentilation of Panels, Cable laying, installation of cable tray, termination in Scada Panels, TFR Panels, Breaker failure, Alarm annunciation Panels, Auto Reclose panels, Control Panels, Metering Panels and IFC Panels. All this work finished under my supervision.
13.8 & 33 KV Over Head Transmission & Distribution Experience:
Installation of Metering Unit.
Installation of Auto Reclose circuit.
Installation of Load Break Down Switches.
Installation of Distribution Transformer up to 500KVA Pole Mounted.
Installation of RMU. Up to 1.5 MW.
Erection of HT and LT Poles.
All kind of Pole(TAN, Section , Angle)
HT stringing and LT stringing up to 66 KV
Installation of transformer up to 500 KVA
All this work with SAUDI ELECTRICITY COMPANY.
Experience in Municipality of Riyadh.
Installation of Lighting Poles.
Installation of High Mast Poles.
Installation of Distribution Transformers.
Maintenance of RMU’s & Pad Mounted Transformers.
Calculation of Electrical Energy.
Cable Routing, Fault Tracing, Using of Fault Locator, Mega Testing of Cables.
Installation of Under Grounds Cables.
Fault Tracing of Underground Cables.
Excavation of Underground Cables.
Installation of New Transformers.
Networking of Electrical Energy.
Installation of M.V Panels, L.V Panels and Transformers.
Installation of Pumps, Motors and Distribution boards.
Cable tray installation.
Installation of different Power and Control Cables.
Cable Laying, Dressing, Magering and Termination.
Understood Cable tray, Earthing and Lighting layout diagrams of whole plant.
Understood different H.T, L.T cables.
Installation of Different Instruments like sensors and switches and valves.
Supervised Lighting and Earthing of the whole project.
Understood the basic layout for executing a project and how to work in a team being a team member