Working professional under Dubai Electric and Water Development Authority and have accomplished different projects of DEWA i.e Comssioning of Capacitor Banks and Main Electrical Panels in Electrical Rooms and Substations of DEWA as a registered engineer under SOE ( Society of Engineers) Dubai. Also a registered engineer under Pakistan Engineering Council. Have practical experience of controlling the electricity generation from NPCC, Islamabad by frequency control as stayed there as a trainee. I believe I am an excellent candidate for the role of Engineering position in your organisation. With more than 5 years experience in Industrial Automation, Industrial Protection, construction and commissioning projects, I have the ability to deliver high-level gains by controlling. I thrive on a job well done and would love to join your team.
MEP Project management.
DEWA Rules And Regulations
Develops electrical products by studying customer requirements; researching and assembly methods and materials.
Develops manufacturing processes by designing and modifying design for building and assembling electrical components; soliciting observations from operators.
Assures product quality by designing electrical testing methods; testing finished products and system capabilities.
Prepares product reports by collecting, analyzing, and summarizing information and trends.
Supervision of Construction Sites with MEP works in various projects.
Planning, monitoring and controlling of actual execution of all electrical related works of various projects.
To ensure that the project will be done in accordance with all the approved construction drawings, contract documents, specifications and all applicable standards.
Dealing with the clients for specifications & project works to execute the progress according to the client requirements.
Planning and Making Electrical Load Schedule for the projects according to the load.
1 - Developing and executing the electrical drawings using AutoDesk / Autocad.
2 - Developed electrical products by studying customer requirements; researching and testing, manufacturing and assembly methods and materials.
3 - Completion of projects according to standards.
4 - Maintained product database by writing computer programs in efficient way.
5 - Completed projects by training and guiding technicians.
6 - Contributed to team effort by accomplishing related results as needed.